BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2024 at 8:00 PM

Updated October 3, 2024

Site work for a pre-engineered storage facility in Honesdale, Pennsylvania. Completed plans call for site work for a pre-engineered storage facility.

Project: Phase 1 Excavation 1. Removal of Existing Shed. 2. Leveling of Ground for a 48' Wide by 40' Long Building 3. 4" Stone Under Concrete Foor 4. 4'x17' Stone Pad for Lp Tank With Modifed on Top. Dig Ditch & Line With Sand (Approx. 40') to Building for Gas Line Project: Phase 2 Building 1. Post Frame Building 48' Wide by 40' Long - 14' High Ceiling (1,920 Sq. Ft.) as Per Structural Plans 2. Auguring/digging Of Holes for Post Frame Building as Needed 3. Designed for Minimum 50lb. Ground Snow Load & a 115mph Wind Load. 4. Post-frame Construction Completely Erected on the Owners Graded and Level Lot. 5. Framing as Per Engineered Plans. 6. 26-gauge Steel Roof, 4:12 Roof Pitch, Vented Ridge Cap, 40-year Kynar Fnish on Sheeting. 7. 29-gauge Steel Siding, Kynar Fnish on Sheeting. Trim With 40-year Fnish. Base Trim Installed. 8. One 3068 Fberglass Entrance Door With on Guard Frame, Insulated, Public Access Sill With Lever Handle, Standard Lockset & Dead Bolt. 9. Three 12x12 Overhead Doors, Steel Insulated, Model 8300, on One Gable End. 10. 12" Covered Overhang at the Eaves and Gables. Color White. 11. Spray Insulation of the Walls to R21 and Roof to R49. 12. White Steel Liner Panel on Ceiling. 2x4 Purlins and White Steel Liner Panel on Interior of Exterior Walls. 13. All Sheeting Fastened With Screw Fasteners, 25-year Roof Fasteners. 14. 6x6 Treated Posts, .60 Retention-cca. Set Below Frost Level on Concrete as Per Plans 17. Concrete Under Posts as Per Engineered Plans. Project: Phase 3 Concrete 1. 6" of 3500psi Concrete Foor With Reinforcement Wire, Vapor Barrier, Cut Expansion Joints as Per Plans. 2. 3 Foor Drains (One in Each Bay) 8"w X 3.3' L Class D Rated 3. 4" Drain Piping Leading to Outside Rear of Building 4. 24" R10 Rigid Foamboard Insulation Around Perimeter as Per Plans Project: Phase 4 Electrical 1. 200- Amp Sub-panel From Existing Building to New Building 2. 8 Gfi Outlets 3. Six Sealed 8' Lights, 2 Per Bay 4. 2 Light Switches at Entrance Door. Each Controlling 3 Lights 5. Wiring for 250,000 Btu Hanging Heater Unit 6. 3 Outlets in Ceiling Over Garage Door Bays for Future, 3/4 Hp Plug in, Overhead Door Operators With Wall Switches by Man Door. Project: Phase 5 Hvac 1. 250,000 Btu Hanging Heater Unit, Propane. 2. New 1000-gal Propane Tank, Installed Approx. 40' From Building. **note: Engineered Plans Will Supersede Anything Written in Outline Above The bid must be accompanied by a certifed/cashiers check or Bid Bond in favor of Cherry Ridge Township, in an amount not less than ten percent (10%) of the total Bid amount. Cherry Ridge Township reserves the right to reject any or all bids or to waive any informality in the bidding process.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$200,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
617
Active Projects
288
Bidding Soon
4,341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

November 1, 2024

Project location map

215 Ski Run Rd, Honesdale, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.