BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work and new construction of an educational facility in West Lafayette, Indiana. Completed plans call for the construction of a 186,000-square-foot, four-story above grade educational facility.

PROJECT DESCRIPTION: Pepper Construction is the Construction Manager for the Purdue University - Nursing & Pharmacy Education Building project located at 175 S Russell St, West Lafayette, IN 47907. This project consists of a new 186,000 SF, 4 story, steel-structured building with a 22' deep basement located on a 3 1/2 acre site. The exterior skin is a combination of limestone, brick, curtainwall, and metal panel and the building is comprised of a basement with mechanical spaces and vivarium, 1st floor classrooms, 2nd floor lab space, 3rd/4th floor lab and office space, and a mechanical penthouse. Construction began August 2024 and will end September 2026. Pepper Construction requests competitive bids for the following Bid Event 3 & 4 bid packages: . BC-09: Sprinkler . BC-10: Plumbing . BC-11a: Mechanical & Controls . BC-11b: Sheet Metal . BC-12: Electrical & Low Voltage . BC-13: Masonry . BC-14: Curtainwall, Storefront & Interior Glazing . BC-15: N/A . BC-16: Waterproofing & Air Barrier . BC-17: Roofing . BC-18: General Trades - toilet accessories/DFH/blocking/projector screens/fire ext./lockers . BC-19: Framing, Drywall & ACT . BC-20: Fluid Applied Flooring . BC-21: Lab Casework & Equipment . BC-22: Millwork . BC-23: Metal Panels . BC-24: Firestopping . BC-25: Fireproofing . BC-26: Office Fronts . BC-27: Tile . BC-28: Resilient Flooring & Carpet . BC-29: Paint & Wallcovering . BC-30: Window Treatments . BC-31: Elevators . BC-32: Overhead Door . BC-33: Signage (interior & exterior) . BC-34: Site Concrete . BC-35: Asphalt Paving . BC-36: Pavers . BC-37: Screenwall (included in BC-23) . BC-38: Fixed Classroom Tables . BC-39: Loading Dock Equipment . BC-40: Joint Sealants PREQUALIFICATION: ALL trade partners must be prequalified with Pepper Construction and Purdue University prior to submitting a bid for this project. Please visit the plan room for prequalification documents/information. The attached project-specific prequalification form should be completed by ALL bidders (unless you already submitted this form during PU - NPEB Bid Event 1 or Bid Event 2) and is due to Caitlin Poe - cpoe@pepperconstruction.com no later than Friday, October 4, 2024, 5:00 PM ET. XBE PROJECT GOAL: This project has an XBE goal of 20% and diverse subcontractors, vendors, suppliers must be certified with the IDOA, Division of Supplier Diversity for diverse spend to count toward the project goal. All diverse subcontractors, vendors, and suppliers are highly encouraged to attend the pre-bid meeting and submit bids for this project.

Under Construction

Educational

$18,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

719

52

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
123
Bidding Soon
1,232
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

October 21, 2024

Project location map

175 S Russell St, West Lafayette, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.