BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2024 at 7:00 PM

Updated December 10, 2024

Renovation of an educational facility in Overland Park, Kansas. Completed plans call for the renovation of a educational facility.

As of November 18, 2024, this project has not yet been awarded. The project is expected to be awarded on November 23, 2024. Clarification Deadline 10/9/2024 5:00 PM Removal of the four (4) existing twenty (20)-ton glycol Liebert units with six (6) eight (8)-ton glycol and chilled water Liebert units at the Regnier Building data center. Chilled water main taps are existing. Project is comprised of three (3) phases to sequentially demo and install the replacement units to maintain data center functionality over the course of the project. An optional alternate is comprised of the removal of the four (4) existing dry coolers and installation of four (4) new dry coolers on the roof. Full project documents can be downloaded on the "Bid Documents" tab (without logging in) via online Any deviation from specified items is considered a substitution. If the contractor desires to use other than specified items, then a formal request for substitution must be submitted prior to bid date (no exceptions), in accordance with the procedures and time limitations set forth in Division 01. Where not defined in Division 01, requests for substitutions shall be submitted no less than ten (10) working days prior to bid date. Review of substitution requests by the Engineer shall be done at the expense of the contractor. Coordination Drawings: Prepare and submit Coordination Drawings as further described herein and as indicated in the Special Conditions. The Engineer shall receive one copy of all coordination drawings supplied to the Owner as required in this specification. It is the responsibility of the Contractor to coordinate the work as outlined herein. Receipt by the Engineer of a copy of the coordination drawings is to verify conformance to the submittal requirements set forth in this specification section. It is not an admission by the Engineer as to the accuracy or completeness of the coordination proposed. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts. Bid Guaranty (Bid Bond): A bid guaranty equal to five percent (5%) a Performance Bond to Procurement Services for the total amount (100%)

Award

Educational

$447,034.00

Public - County

Renovation

23

6

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
89
Bidding Soon
1,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

November 15, 2024

Project location map

12345 College Blvd, Overland Park, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.