BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 27, 2024 at 7:00 PM

Updated November 28, 2024

Site work and paving for a mixed-use development in El Centro, California. Working plans call for site work for a municipal facility; for paving for a municipal facility; sidewalk / parking lot; and sidewalk / parking lot.

**As of November 27, 2024 no bids received for this project. As of this time it is unknown if and when project will rebid. Online Q&A Yes Q&A Deadline 10/10/2024 5:00 PM (PDT) SCOPE OF WORK The scope of work is for the Construction Services required for the Planning & Development Services Building / Parking Lot Improvements / Maintenance consisting of: 1. Remove existing Concrete Wheel Stops for parking lot improvements (save for later). 2. Preparation of the existing parking lot to receive surface treatment consisting of but not limit to: o Clean the old pavement surface from any dust with power brooms, street sweepers, and power wash if necessary. o Clean and or seal all oil drip areas. o Removal of pavement marking if any (raised markers, thermoplastic striping) o Masking/protect all areas not to receive surface treatment. o Seal all Cracks wider than 1/4 " with specialty crack sealer material. 3. Application of Type I Slurry Seal Coat must be done on the entire Parking Lot area with asphalt surface. 4. Reinstall existing Concrete Wheel Stops to the original location. 5. The New Parking Striping will be following the Existing Parking Layout

Final Planning

Sidewalks / Parking Lot

$667,000.00

Public - County

Paving, Site Work

7

3

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
19
Bidding Soon
290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2024

May 27, 2025

Project location map

801 Main St, El Centro, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.