Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Daytona Beach, Florida. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Counties: Volusia Road Name: SR 430 (Mason Ave) Project(s): 44879815201(*) Federal Aid No: D523067B Contract Days: 330 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Please read the full advertisement Description: The Improvements under this Contract consist of but are not limited to, MOT (standard, pedestrian longitudinal channelizing devices ), erosion control (sediment barrier), monitor existing structures (inspection, settlement, vibration), clearing (tree root and branch pruning, tree trimming), concrete (removal, curb and gutter, sidewalk), earthwork (regular excavation, embankment, stabilization), asphalt (base, milling, resurfacing, overbuild, widening), drainage (manholes adjustments), pavement markings (detectable, painted, thermoplastic, raised marker, vertical deflection, railroad dynamic envelope ), signing (single-post, removals), signalization (signal cable, aluminum pole, pedestrian signal, pedestrian detector), conduit, pull/splice box, performance turf and sod along SR-430 from Clyde Morris Boulevard to East of Beach Street for 2.370 miles in the cities of Daytona Beach and Holly Hill, Volusia County. Question Deadline 10/23/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 009 - Resurfacing - SR 430 (Mason Ave)
Post-Bid
Roads / Highways
$10,496,561.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2024
December 30, 2024
Mason Ave, Daytona Beach, FL
Related To This Project
Daytona Beach, FL
Bid Date: Oct 28 2024
Daytona Beach, FL
Bid Date: Mar 05 2019
Daytona Beach, FL
Bid Date: Nov 11 2024
Daytona Beach, FL
Bid Date: Nov 21 2024
Daytona Beach, FL
Bid Date: Oct 23 2024
Daytona Beach, FL
Bid Date: Nov 04 2024
Daytona Beach, FL
Bid Date: Nov 08 2024
Daytona Beach, FL
--
Daytona Beach, FL
Bid Date: Oct 31 2024
Daytona Beach, FL
Bid Date: Oct 31 2024
Daytona Beach, FL
Bid Date: Oct 24 2024
Daytona Beach, FL
Bid Date: Oct 29 2024
Daytona Beach, FL
Bid Date: Oct 18 2024
Daytona Beach, FL
Bid Date: Oct 14 2024
Daytona Beach, FL
Bid Date: Nov 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.