BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2024 at 8:00 PM

Updated October 31, 2024

Site work, new construction, remodeling and renovation of a fire / police facility in Fowler, California. Completed plans call for the construction of a fire / police facility; for the renovation of a fire / police facility; for site work for a fire / police facility; and for the remodel of a 15,000-square-foot fire / police facility.

The base bid involves remodeling the existing Administration area and adding a second floor to the two- story volume. Construction is done by way of wood bearing walls and I-joist floor framing. The 1st floor remodel includes creating a lobby and receptionist area to separate the public from the Administration area. Access to the second floor is by way of an elevator with a mechanical room and stairs in the center of the remodel space. The added second floor includes three separate sleeping quarters with a living space and two restrooms. Egress from the second floor is achieved by the interior stair and a premanufactured exterior stair. A new roof access is created to allow access from the second floor to the low roof. The remodel also includes but is not limited to added mechanical and plumbing and electrical work at the remodel space and second floor. The scope of work for Add Alternate #1 involves saw cutting and removing a portion of the concrete floor around the trench drain in the apparatus. The trench drain is to be lowered and the concrete floor is to be poured back with slopes. The scope of work for Add Alternate #2 involves completely removing the roof membrane and roof drains at the low roof. The roof drains are to be replaced in kind and roof to be cover with roof system as specified. Question Deadline 10/08/2024 at 5:00 PM PT Bidders must submit all questions in the PlanetBids portal; responses will appear in the PlanetBids portal. Visit the PlanetBids portal site for results and awards. Interior Remodel and the Addition of a Second Floor, Including Mechanical, Plumbing and Electrical Upgrades

Post-Bid

Fire / Police

$5,000,000.00

Public - City

New Construction, Remodeling, Renovation, Site Work

50

21

14

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
50
Bidding Soon
596
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

December 16, 2024

Project location map

221 E Main St, Fowler, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.