BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Site work and paving for a mixed-use development in Fowler, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of September 11th, 2025, the project is canceled. Project is no longer needed.** Response Types Line Items List of Contractors (required) Bid Schedule (required) Remaining Bid Docs (required) Type of Award Lump Sum. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%. Pre-Bid Meeting No. Question Deadline 08/26/2025 at 2:00 PM PT Online Q&A Yes. Inquiries regarding this project should be directed to Soo Ho Park, City Engineer at spark@ppeng.com. Scope of work includes full compensation for all labor, materials, tools, equipment, and incidentals to furnish and install signage and striping to add new bike lanes and facilities on several streets within the City of Fowler. Contractor shall furnish and install improvements to include new thermoplastic crosswalks, green and white bike lane markings, parking stall striping, painted red curbs, and bike lane signage. Concrete flatwork shall be constructed for bike repair and air-filling, as well as for bike racks installed as part of this project. Additionally, the contractor shall remove all conflicting striping within the project area. All Improvements are shown in the project drawings in Appendix B– Bikeway to Transit Plans. All items shall be removed or constructed per City of Fowler standard drawings and specifications.

Project Abandoned

Sidewalks / Parking Lot

$800,000.00

Public - City

Paving, Site Work

14

6

2

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
55
Bidding Soon
704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

September 12, 2025

Project location map

Multiple Locations, Fowler, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.