BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Turlock, California. Contact the soliciting agency for additional information.

Question Cutoff Date: 9/18/2024 Request for Information (RFI) should be directed to: purchasing@turlock.ca.us The City invites you to submit a proposal for a comprehensive Water Rate Study. The scope of work includes, but is not limited to, the following: A proposed minimum Scope of Services is listed below: Kick-off Meeting. o Meet with City staff to identify information needed for review and to layout schedule. o Provide follow-up written minutes. Data Collection. o Provide a comprehensive list of data requirements for City staff to provide that will support the study. Revenue Requirement Analysis. o Perform a revenue requirement analysis utilizing a generally accepted approach for a 10-year projected time period. Revenue requirements include Operations and Maintenance, basic repair and replacement needs, capital improvement projects, and reserve funds. Revenue requirements should also include an analysis of future water consumption scenarios based on weather patterns and state regulations, to assess the impacts of water consumption changes, regulatory changes, or other unforeseen events on water rates. Progress Meetings. o Conduct bi-weekly project meetings to review progress with City staff and coordinate continuing project activities. Take and distribute minutes for meetings. Cost of Service Analysis. o Perform a cost of service analysis to equitably allocate the previously developed revenue requirement to the various customer classes as determined by each revenue collecting methodology. This task should include benchmark comparisons to agencies with similar populations and utility structures. Rate Design Analysis. o Design a rate model including: All necessary revenues. Debt service options & costs. Up to four (4) recommended rate structure options with an evaluation of advantages and disadvantages of each. Capital project financing scenarios (including schedules) o Prepare comparison of current and proposed rates to water rates of peer agencies. o Work with City Staff including City Attorney and or other specialized legal representation as it applies to utility rate setting. Reports and Presentations o Prepare reports and present findings and rate recommendations to City staff. o Incorporate any City comments and finalize report. o Prepare rate structure, reports, and findings to present at a public workshop. o Assist City staff with developing the annual rate review which incorporates conditional, automatic adjustments into the rate review options, based on a number of accepted variables (triggers). o Prepare and present rate study to City Council at a Public Hearing in collaboration with staff. Proposition 218 Assistance. o Assist City staff with the Proposition 218 process. This includes but is not limited to preparing notices, resolutions, and any other documentation necessary. Update City's Turlock Municipal Code (TMC) Public Outreach (Cost proposal should reflect this task separately) o Public meeting (s) With community or/and key stakeholders o Educational material o Temporary Website At the discretion of the City, deliverables shall be provided to the City in the form of hard copies as well as electronic copies for all specifications, reports, and all documents, including but not limited to: plans, analysis, specifications, studies, and any necessary technical data and shall become property of the City. Notwithstanding the inclusion of services in this RFP, the final scope of services negotiated between the City and the successful Proposer shall be set forth in the Professional Services Agreement ("Agreement") executed by and between the City and the successful Proposer. A copy of the Agreement is attached.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
136
Bidding Soon
2,436
All Active Projects
1,053
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 2, 2025

img_map_placeholder

Multiple Locations, Turlock, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.