BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a service station / car wash facility in Los Angeles, California. Completed plans call for site work for a service station / car wash facility.

3-Sites Electrification Project The proposed Project consists of adding Level 2 Chargers to three (3) sites: A. San Julian Bus Yard - 1430 San Julian Street Los Angeles CA 90015 B. Rinaldi Adult Center - 17450 Rinaldi Street, Granada Hills CA 91344 C. Maintenance and Operations N1 - 6651 Balboa Blvd, Lake Balboa, CA 91406. The Contractor shall insure that the EV Charging stations are compatible with existing 'bp Pulse' Electrical Vehicle Management system (EVMS) and capable of optimizing the timing, electrical loads and charging performance of the EVCS to benefit the District's electrical, financial and operation objectives. An updated 5-year warranty shall be provided for the EVCS and EVMS which includes customer technical support, subscription fees and 100% parts, labor, software, and programming coverage. The Contractor shall provide a Maintenance agreement option for a minimum of 5 years. The Maintenance agreement shall include annual preventative maintenance, troubleshooting and repair of any charger equipment and/or software not allowing required electric bus charging. The Contractor shall provide a minimum of 95% or better bus charging up-time. If the charging system provides less than 95% bus charging up-time, the Contractor shall provide a response & solution within 24 hours that is acceptable to LAUSD and regains the minimum of 95% EV bus charging uptime. After Substantial Completion, the EV bus charging system shall be installed and operational to a minimum of 95% bus charging uptime in a maximum of 30 calendar days. Contractor shall provide an alternate bus charging method if a solution to maintain 95% bus charging up-time is not provided within 24 hrs of bus charging uptime falling below 95%. MEP subcontractors that are not currently prequalified by the District must submit the Subcontractor Prequalification Questionnaire at least ten (10) business days before and must be approved at least five (5) business days before the SOQ due date indicated on the Important Initial Information page 2 of this RFQ. MEP subcontractors that will be listed in the bid submittal but have not been prequalified by the District prior to the price bid due date will not be eligible to bid or perform work on the Project. Requests for Clarification/Information (RFC/RFI) Due 3:00 p.m., October 3, 2024 All firms intending to respond to this Request need to register at Los Angeles Unified School District's Facilities Services Division website supplying your email address and choosing a password you will retain for use when accessing the website in the future. The request is in Adobe format. You may need to download the latest version of Adobe to view the Request; a link for the Adobe download may be found at the District's website. All documents related to this request will be posted on this website. Pre bid meeting notes: Topics covered at the non-mandatory pre-proposal meeting will include project descriptions, general construction issues unique to this Project, and information on how to submit a response to a 17250 RFQ & RFP. Attendance at this meeting is not mandatory. However, General Contractors and others (Architects, Subcontractors, suppliers, etc.) are welcome to attend. The District, at its discretion, reserves the right to contact others, not limited to Districts, project managers, construction managers, inspectors, District staff, etc., to evaluate and score this section. The scoring of this section is not solely limited to the information provided by the proposer. The District will score the top three projects of each category (i.e. SBE, Local Worker, etc.). The District reserves the right to revise or amend the solicitation prior to and/or after the date set for receipt of the SOQ. Such changes, if any, will be announced by via addenda to this solicitation. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. value- $7,500,000.00

GC Bidding

Service Station / Car Wash

$7,500,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,243
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 14, 2025

img_map_placeholder

Multiple Locations, Los Angeles, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.