Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2025 at 8:00 PM

Updated April 4, 2025

Renovation of a detention facility in Newton, Iowa. Completed plans call for the renovation of a detention facility.

Boiler Replacement and removal of existing fuel storage tank at Newton Correctional Facility. The project includes: 1. Boiler Replacement (x2) in 2 phases including all associated equipment, fittings, piping. 2. Removal and backfill of existing buried Underground Storage Tank (UST). 3. Provide and install back up fuel source propane tank and all associated equipment, fittings, and piping. Direct all inquiries to the construction manager. Addendum #1 has been issued as of 12-10-2024. Questions must be submitted by 2:00 pm, December 5, 2024 to the Issuing Officer.

Award

Jails / Prisons

$1,000,000.00

Public - State/Provincial

Renovation

11

14

19

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
56
Bidding Soon
914
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2025

May 1, 2025

Project location map

307 S 60th Ave W, Newton, IA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed