Site work for a water / sewer project in Beaufort, South Carolina. Completed plans call for site work for a water / sewer project.

Description: The City of Beaufort is seeking proposals from qualified design-build contractors for improvements to Pigeon Point Landing. The scope of services includes (1) boat ramp design/repair/replacement, (2) dock design and replacement, and (3) landing master plan design. The project will be completed through a design-build contract, with separable scopes for the design and build phases. Question Deadline 10/11/2024 at 4:00 PM ET Equal Employment Opportunity The City of Beaufort is seeking proposals from qualified design-build contractors for improvements to Pigeon Point Landing. The scope of services includes (1) boat ramp design/repair/replacement, (2) dock design and replacement, and (3) landing master plan design. The project will be completed through a design-build contract, with separable scopes for the design and build phases. Please see (Attachment A: Memorandum and Survey Results) for further information regarding the current state of the landing and potential scoping. Each contractor must address the following requirements: 1. Boat Ramp Design/Repair/Replacement: o Design Phase: o Assess the existing boat ramp structure and condition. o Propose designs for repair, upgrade, or replacement of the boat ramp. o Ensure compliance with safety, environmental, and accessibility standards. o Engage the public to gather input, ensuring local stakeholder needs are met (e.g., through community meetings or surveys). o Provide a detailed design report, including engineering specifications, cost estimates, and construction schedules. o Build Phase: o Execute the approved design for the boat ramp, including demolition (if necessary), material procurement, and construction. o Coordinate construction activities to minimize disruption to public access and usage. o Conduct all necessary environmental and safety checks during construction. Page 5 of 13 2. Dock Design and Replacement: o Design Phase: o Evaluate the current condition of the dock, identifying specific areas for repair or replacement. o Propose designs for a new or rehabilitated dock, incorporating public input. o Designs must cater to a variety of users, including boaters, kayakers, and paddleboarders, ensuring user safety and conflict reduction. o Provide cost estimates, environmental impact assessments, and timelines for dock replacement or repair. o Build Phase: o Perform the necessary dock replacement or repair as per the approved designs. o Ensure adherence to environmental protection and public safety standards. o Schedule work to minimize disruption to landing users and ensure completion within the agreed time frame. 3. Landing Master Plan: o Design Phase: o Develop a comprehensive master plan for Pigeon Point Landing, incorporating parking, lighting, landscape improvements, and safety features as indicated in the public feedback and survey results. o Ensure the plan accommodates current and future needs, balancing community usage with the preservation of natural beauty and environmental integrity. o Include specific design elements, such as a dedicated kayak/paddleboard launch area, improved parking layout, safety/security measures (lighting, cameras), and amenities such as benches and restrooms. o Propose measures to maintain a balance between the landing's usability and residential neighborhood concerns (e.g., traffic calming measures and light pollution minimization). o Build Phase: o Perform the necessary improvements as per the approved designs. o Ensure adherence to environmental protection and public safety standards. o Schedule work to minimize disruption to landing users and ensure completion within the agreed time frame. Separable Scope: Proposals must present separate budgets, timelines, and work plans for the design and build phases of each project element (boat ramp, dock, and master plan). The City reserves the right to approve each phase independently. Page 6 of 13 Public Engagement Requirement: For the design phase of each element, the contractor must include a detailed public input process, which may involve: o Hosting at least two public meetings or workshops. o Conducting surveys or interviews with stakeholders. o Incorporating public feedback into the final design to ensure community alignment with the project goals.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
34
Bidding Soon
502
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

July 4, 2025

img_map_placeholder

2427 Pigeon Point Rd, Beaufort, SC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.