BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Kersey, Colorado. Contact the soliciting agency for additional information.

Reference Number 0000364206 The Phase 2 Assessment identified asbestos in about: 300 square feet (SF) of texture (on non-detect drywall), 2,000 SF of roofing tar, 120 SF of cementitious roof edge material, 13,500 SF of plaster material on the concrete silos, 768 SF plaster material on warehouse seams, and 800 SF of exterior black tar. The Phase 2 stated that there are other areas that may include asbestos-containing materials (ACM) that were inaccessible or would require selective demolition to identify (i.e., behind covered walls or ceilings, inside areas of ductwork or mechanical equipment) or within inaccessible areas (e.g., the flooded basement area). It also stated that the office south of the silo contains a significant amount of pigeon feces which must be removed and disinfected before the ACM can be removed in accordance with CDPHE Regulation 8. The purpose of this competitive Request for Proposals is to engage a qualified environmental professional (QEP) to finalize and oversee the ABCA and cleanup plan and dispose of media in accordance with state and federal law. Contaminated media includes ACM in concentrations greater than 1%. The QEP will help the Town select and manage a General Abatement Contractor (GAC), in accordance with CDPHE Regulation 8. A qualified Project Manager will oversee the GAC to ensure regulations are followed and to conduct full visual inspections of asbestos abatement work areas. Following visual inspection, clearance testing will be conducted by a CDPHE certified Air Monitoring company so that the work area can be deemed clean. Third-party oversight will be provided during the abatement activities to conduct air sampling and clearance sampling by a State of Colorado Project Manager, per qualifications in Regulation 8, Part B. All ACM will be properly disposed of at a licensed landfill facility approved to accept such waste. Clearance samples will be analyzed per the National Institute for Occupational Safety and Health (NIOSH) #7400 requirements and must show less than 0.01 fiber per cubic centimeter (fivers.cc) of asbestos in work area air. Prior to removal of the ACM, the pigeon guano in the office will be cleaned and disinfected. Question Deadline 10/11/2024 at 12:00 PM MT Questions are submitted online No, The full RFP, including detailed project information and selection criteria, can be obtained by contacting Danna Ortiz at DOrtiz@KerseyGov.com or going to the Town's website: Kerseygov.com. Questions and responses will be shared with all interested parties via email. Please provide your current email address. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required The Town of Kersey reserves the right to reject any and all proposals and to waive any irregularities or informalities in the proposals.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
43
Bidding Soon
917
All Active Projects
400
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

img_map_placeholder

Multiple Locations, Kersey, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.