BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2024 at 7:00 PM

Updated July 12, 2025

Site work for a water / sewer project in Santa Fe, New Mexico. Completed plans call for site work for a water / sewer project.

Public Works Department requests bids forthe purpose of procuring a licensed, insured,and qualified Contractor to provide construction services fora new waterline to the Turquoise Trail bulk water station utilizing construction plans and technical specification from Wilson and Company. Bids are requested by Santa Fe County for Turquoise Trail Bulk Water Project. This project involves the installation of a new waterline along NM-14, extending from Turquoise Trail Elementary School to a designated location for a new bulk water station. The scope includes site access from Turquoise Trail Court, the foundation for the bulk water station, connection to the new waterline, and the provision of electrical power and SCADA services for the station. The bids shall be based upon the material descriptions, units, and estimated quantities shown on the attached bid sheets. Final payment will be made upon quantities completed in accordance with the specifications, measured and accepted by the County, paid at the unit prices contained in the bid. Question Deadline 10/15/2024 All questions about the meaning or intent of these documents shall be submitted only to the Engineer of Record, stated above, in writing for interpretations. Questions received less than seven (7) calendar days prior to the date for opening of bids will not be answered. In relation to the Invitation for Bid will be directed to: Dani Koussa, Procurement Specialist Senior Santa Fe County Purchasing Division 102 Grant Avenue Santa Fe, NM 87501 Ph. 505-986-6344 Fax (505) 989-3243 Email - dkouss@santafecountynm.gov Santa Fe County reserves the right to reject any and all bids in part or in whole The work to be completed is located at 3 Turquoise Trail Ct, Santa Fe, New Mexico 87508. The scope of this project involves the installation of 13,032 feet of 12-inch PVC waterline via open trench in Santa Fe County, New Mexico. It includes the transfer of one service line from the Fire Station to the main line, decommissioning the pressure-reducing tanks, and installing 144 feet of 4-inch PVC waterline to a new bulk water loading station. The site for the new bulk water loading station will feature an access road, a driving pad, a building pad, a loading station package, and site electrical and communication lines connected to the Fire Station, as well as coordination for new electrical utilities. All work will be conducted on property owned by Santa Fe County or within the NMDOT right-ofway All qualified bidders willreceive considerationof contract(s) withoutregard to race, color,religion, sex, national origin, ancestry, age,physical and mental handicap, seriousmental condition, disability, spousal affiliation, sexual orientation or gender identity.

Bid Results

Water / Sewer

$3,520,510.00

Public - County

Site Work

34

18

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
11
Bidding Soon
254
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2024

November 25, 2024

Project location map

3 Turquoise Trail Ct, Santa Fe, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.