BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving and new construction of a mixed-use development in Arroyo Grande, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

In general the project consists of replacing the existing Arroyo Grande Creek Bridge at Traffic Way by replacing the existing Cast-In-Place Reinforced Concrete Tee-Beam bridge with a 3-span post-tensioned concrete box girder bridge. Project elements include HMA paving, rock slope protection, sidewalks, driveways, drainage, and stormwater treatment. The project estimated construction cost for the bid is $11,600,000. Contract time is established as 140 working days. Bids received by Fax or Email will not be considered. By submission of bid you agree to comply with all instructions and requirements in this notice and the contract documents. All bids must be submitted on the Bid Item List form(s) provided and submitted with all other Bid Forms included in these Special Provisions. Each bid must be accompanied by either a: 1. certified check 2. cashier's check 3. bidder's bond made payable to the City of Arroyo Grande for an amount equal to ten percent of the bid amount as a guaranty. Guaranty will be forfeited to the City Arroyo Grande if the bidder, to whom the contract is awarded, fails to enter into the contract. The City of Arroyo Grande reserves the right to accept or reject any or all bids or waive any informality in a bid. All bids are to be compared on the basis of the Public Works Director's estimate of the quantities of work to be done, as shown on the Bid Item List. Bids will only be accepted from bidders that are licensed in compliance with the provisions of Chapter 9, Division III of Business and Professions Code. The award of the contract, if awarded, will be to the lowest responsive bid submitted by a responsible contractor whose bid complies with the requirements prescribed herein. If the contract is awarded, the contract will be awarded within 60 calendar days after the opening of the bids. Failure to raise defects in the notice to bidders or bid forms prior to bid opening constitute a waiver of those defects. The Caltrans Standard Specifications, Standard Plans, and Revised Standard Plans may be viewed at online and may be purchased at the Publication Distribution Unit. You are responsible to obtain all issued addenda prior to bid opening. Addenda will be available to obtain online or at the office of the Public Works Director. Contact the City Engineer, Shannon Sweeney at (805) 473-5444 or the Public Works Department at (805) 473-5485 prior to bid opening to verify the number of addenda issued. You are responsible to verify your contact information is correct on the plan holders list located online. Question Deadline 10/16/2024 at 4:00 PM PT Written questions will be received at email address ssweeney@arroyogrande.org. In accordance with the provisions of California Labor Code Sections 1770,1773, 1773.1, 1773.6 and 1773.7 as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Section 1773 for the locality in which the work is to be performed. A copy of said wage rates is on file at the office of the Owner. It shall be mandatory upon the contractor to whom the work is awarded and upon any subcontractor under the contractor to pay not less than said specified rates to all workmen employed by them in the execution of the work. In accordance with the provisions of California Public Contract Code Section 3300, the City has determined that the contractor shall possess a valid Class A license from the time of contract award through Contract acceptance. Failure to possess the specified license shall render the Bid as non-responsive and shall act as a bar to award of the Contract to any bidder not possessing said license at the time of award. In the event of dispute over classification of the license required, the opinion of the Contractor's State License Board shall prevail.

Bid Results

Bridges / Tunnels

$10,799,051.00

Public - City

Demolition, New Construction, Paving, Site Work

96

11

4

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
9
Bidding Soon
229
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

December 23, 2024

img_map_placeholder

Traffic Way, Arroyo Grande, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.