BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Advance, Missouri. Completed plans call for site work for a water / sewer project.

Advance I&I Repairs. Site Address: 103 North Oak Street Description: The proposed project includes cleaning and video inspection of approximately 53,744 linear feet of gravity sewer line and CIPP lining for approximately 11,555 linear feet of 8 inch gravity sewer line. MBE (10%), WBE (10%) Item No. 1 - Mobilization/Demobilization: Description: Mobilization shall include the cost of transporting materials and machinery to the project site, site preparation, equipment setup and testing, temporary erosion control measures, any required permits, and any and all other work needed to begin work on the project. Demobilization shall include the cost of removing materials and machinery from the project site, final cleanup, equipment breakdown, completing any required permits, and any and all other work needed to finish work on the project. 2. Method of Payment: Lump Sum Item No. 2 - Line Cleaning and Video Inspection: Description: This item shall include all labor, equipment, and materials needed to clean and video the existing sewer lines as shown within the plans. This item shall include the removal of roots if required by using hydraulic and or mechanical outlets, the furnishing of summary of findings and complete video footage, and any other items necessary to provide a complete and functional project as outlined in the project plans and specifications. 2. Method of Payment: Linear Foot. CIPP Lining: 1. Description: This item shall include all labor, equipment, and materials needed to successfully install Cured-ln-Place Pipe. This item shall include all labor and materials needed to install a liner in sewer lines including but not limited to setup, TV inspection, line cleaning, by pass pumping, liner installation, liner curing, service restoration, public notices, traffic control, testing and any and all other items needed to provide a complete and functional sewer liner as shown on the drawings and described in the specifications. 2. Method of Payment: Linear Foot.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

13

7

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
20
Bidding Soon
316
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2024

December 4, 2024

img_map_placeholder

Multiple Locations, Advance, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.