BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Independence, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City has been awarded federal funding from the Mid America Regional Councils (MARC) Surface Transportation Alternatives Program (TAP) fund to support this Project. The project will implement the Citys Complete Streets Policy and include the addition of new ADA compliant sidewalks and ramps, as well as bicycle lanes or a shared use path, pedestrian signal improvements, transit stop improvements, and new green infrastructure along 23rd Street (M-78) from M-291 to Speck Road. The project will provide alternative transportation modes for the community and improve access to the bus route along 23rd Street. These improvements will enhance the safety of all transportation users in the area, especially local school children, and connect residents and users to 3 middle schools and a nature park located on Speck Road. The city also wishes to improve landscaping and utilize best management practices (BMPs) to improve water quality while providing sufficient attenuation measures. This in return will improve air quality and offers environmental protection for the citys resources. Deadline for questions October 23, 2024, 4:00 p.m. local time, Submit questions regarding this RFP online by deadline in the RFP schedule. DBE Requirements - This contract will have a DBE goal of 6% and 0 trainees. The method of Contractor Selection has not been Determined at this time. MODOT - RFP Engineering - 23rd Street (M-78) Complete Streets - Phase 2 - M-291 to Speck Rd

Conceptual

Roads / Highways

$1,450,086.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
33
Bidding Soon
731
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2025

img_map_placeholder

MO-78, Independence, MO


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.