BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Independence, Missouri. Completed plans call for the renovation of a water / sewer project.

The City of Independence, Missouri's Water Pollution Control Division of the Municipal Services Department is soliciting proposals from qualified contractors to renovate the men and women's locker room, basement floor hallway, main floor back employee entrance, corridor with the men's/women's rest rooms, reception lobby area & offices and new front office. The winning respondent will be required to provide a one year payment, performance and maintenance bond. Contractor is required to provide the bond on the attached city bond form. Bond is not required to be submitted at the time of responding to the RFP. Question Deadline 10/24/2024 at 5:00 PM CT Submit questions regarding this RFP online SCOPE OF SERVICES BASEMENT FLOOR Woman's Locker Room Install new ceiling grid & specified tiles Use CertainTeed Aquarock ceiling tile in designated areas. (Shower area & entrance - within blue highlights) Use CertainTeed Vinylrock ceiling tile in designated areas. (Locker room area) Use CertainTeed EZ-STAB classic aluminum white grid system Install 2 Recessed 2x2 LED fixtures in the shower area, (to be provided) Install 3 recessed 2x4 fixtures in the locker/bath area, (to be provided) Replace 1 HVAC diffuser, add return air return grates in ceiling grid (prox. 2) Prepare & Paint back wall white. Sherwin Williams White # (TBD) Men's Locker Room Install new ceiling grid & specified tiles Use CertainTeed Aquarock ceiling tile in designated areas. (Shower & bench room area just outside the shower -within blue highlights) Use CertainTeed Vinylrock in designated areas. (Locker room area) Use CertainTeed EZ-STAB classic aluminum white grid system Install 2 Recessed 2x2 LED fixtures in the shower area (to be provided) Install 5 recessed 2x4 LED fixtures in the locker room hallway area from entrance door into area outside shower, (to be provided) Install 2 recessed 2x4 fixtures in the hallway area between the two entrance doors (to be provided) Install 4 recessed 2x4 fixtures in the locker/bath area. (2/locker area - to be provided) Install 3 recessed 2x4 fixtures in the restroom area, (to be provided) Replace 12 HVAC diffuser, add return air grates in ceiling grid (prox. 4-6) Prepare & Paint back wall of locker room & restroom area white. Sherwin Williams White # (TBD) Basement Floor Hallway - (Corridor 06) Install new ceiling grid & specified tiles Use CertainTeed Vinylrock ceiling tile in hallway. Use CertainTeed EZ-STAB classic aluminum white grid system Install 6 Recessed 2x4 fixtures in the hallway (to be provided) Install 3 Recessed 2x4 LED fixtures in the hallway area at the bottom of the steps by offices (to be provided) Replace 7 HVAC diffusers in the hallway, add return air grates in the ceiling grid (prox. 2) Prepare & Paint hallway walls white. Sherwin Williams White # (TBD) Replace all cove base with new 4" (brown) Quote as option 1A to remove existing tile & replace basement hallway with Epoxy flooring Remove quarry tile, prep & level floor, install epoxy floor in this area to mate up to the existing hallway epoxy floor in corridor 121. Paint this entrance area, stairwell to the basement, & down main level corridor 121 to corridor 114. Paint all of corridor 114 - it wraps around and goes past the steps & turns right and goes down behind the control room. Paint the stairwell down from corridor 114 to the basement and the stairwell to the second-floor landing. Paint the landing area as designated, but do not paint from the first landing to the top landing. Paint all door frames on the hallway side to match the cove base. Discuss options for recovering the stairwell from this entry lobby (120 area) to the basement hallway - (Possibly replicate stairwell to basement with tread plate & cove cover) Corridor 102 (Corridor with Men's/Women's rest rooms) This corridor will have flooring removed, prepped, & new epoxy flooring installed to mate with corridor 114 that has existing epoxy flooring. (Green highlighted area) Paint & install new 4" cove base. Paint Men's & Woman's non tiled restroom walls white. Sherwin Williams White # (TBD) Discuss options for replacing carpet section in Woman's rest room. Roppe Dark Gray - 4" Trim paint to match cove base, Sherwin Williams custom (Gray Promar 200 Eggshell color match) Epoxy specification: Full Flake Warm Stone (color used for existing epoxy)

Post-Bid

Water / Sewer

$1,550,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
32
Bidding Soon
736
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

December 28, 2024

img_map_placeholder

9600 Norledge Ave, Independence, MO


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.