Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Advance, Missouri. Completed plans call for site work for a water / sewer project.
Advance I&I Repairs. Site Address: 103 North Oak Street Description: The proposed project includes cleaning and video inspection of approximately 53,744 linear feet of gravity sewer line and CIPP lining for approximately 11,555 linear feet of 8 inch gravity sewer line. MBE (10%), WBE (10%) Item No. 1 - Mobilization/Demobilization: Description: Mobilization shall include the cost of transporting materials and machinery to the project site, site preparation, equipment setup and testing, temporary erosion control measures, any required permits, and any and all other work needed to begin work on the project. Demobilization shall include the cost of removing materials and machinery from the project site, final cleanup, equipment breakdown, completing any required permits, and any and all other work needed to finish work on the project. 2. Method of Payment: Lump Sum Item No. 2 - Line Cleaning and Video Inspection: Description: This item shall include all labor, equipment, and materials needed to clean and video the existing sewer lines as shown within the plans. This item shall include the removal of roots if required by using hydraulic and or mechanical outlets, the furnishing of summary of findings and complete video footage, and any other items necessary to provide a complete and functional project as outlined in the project plans and specifications. 2. Method of Payment: Linear Foot. CIPP Lining: 1. Description: This item shall include all labor, equipment, and materials needed to successfully install Cured-ln-Place Pipe. This item shall include all labor and materials needed to install a liner in sewer lines including but not limited to setup, TV inspection, line cleaning, by pass pumping, liner installation, liner curing, service restoration, public notices, traffic control, testing and any and all other items needed to provide a complete and functional sewer liner as shown on the drawings and described in the specifications. 2. Method of Payment: Linear Foot.
Post-Bid
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2024
December 4, 2024
Multiple Locations, Advance, MO
Related To This Project
Advance, MO
--
Advance, MO
Bid Date: Sep 18 2023
Advance, MO
Bid Date: May 18 2022
Advance, MO
Bid Date: Oct 17 2022
Advance, MO
Bid Date: Oct 05 2022
Kansas City, MO
Bid Date: Nov 01 2024
Doniphan, MO
Bid Date: Oct 17 2024
Poplar Bluff, MO
--
Poplar Bluff, MO
--
Poplar Bluff, MO
--
Poplar Bluff, MO
--
Farmington, MO
Bid Date: Nov 05 2024
Poplar Bluff, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.