BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Cape Girardeau, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Cape Rock Water Treatment Plant Hydraulic Bottleneck Improvements The improvements consist of the following at the Cape Rock Water Treatment Plant: 1. Addition of new piping, valves, supports and other appurtenances within the filter building piping gallery (lower level). Tie-in to existing filter influent line in the filter piping gallery (lower level). 2. Addition of new piping, valves and other appurtenances for connection to the secondary sedimentation basins. 3. Addition of four new dehumidification units and three new circulation fans within the filter building piping gallery (lower level). 4. Alternative #1: Addition of 14 new flow meters, new butterfly valve and associated piping on the filter effluent piping to filters #7 to #20. 5. Alternative #2: Addition of 14 new backwash valves and associated piping on the filter effluent piping to filters #7 to #20. 6. Obtaining all permits for construction of Work not obtained by Engineer or Owner. 7. Removing all debris and excess materials from Project Site generated by construction Work. 8. Restoring areas disturbed by construction to original condition or as specified by Contract Documents. Question Deadline 10/15/2024 at 12:00 PM CT All questions concerning the project shall be submitted in writing to the City of Cape Girardeau Project Manager, Tim Richmond

Bid Results

Water / Sewer

$688,025.00

Public - City

Paving, Site Work

38

23

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
22
Bidding Soon
315
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

November 21, 2024

img_map_placeholder

E Cape Rock Dr, Cape Girardeau, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.