BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and addition to an educational facility in Boulder, Colorado. Working plans call for the addition of a 3,500-square-foot educational facility; for the demolition of a educational facility; and for site work for a educational facility.

As of April 7, 2026, a construction manager has been selected and the project is currently in the design development phase. Sub-bidding is anticipated to begin in summer 2026. Construction is expected to start in August or September 2026 and conclude in June or July 2027. *The closed solicitation has been included below for reference: Reference Number 0000367796 Job Location: Boulder, CO The University of Colorado Boulder seeks a qualified Contractor to provide CM/GC services to construct a 3500 SF clean room addition to the existing SEEL COSINC clean room. The University of Colorado Boulder has been awarded a National Science Foundation (NSF) grant to build a 3500 GSF cleanroom addition to the existing Colorado Shared Instrumentation in Nanofabrication and Characterization (COSINC) cleanroom facility located on the first level of the Sustainability, Energy, and Environment Laboratory (SEEL) building. Of the 3500 GSF planned, approximately 600 SF is anticipated to be dedicated mechanical space to accommodate toxic gas cabinets, a nitrogen generator, an oil-free compressor system and other associated mechanical equipment to support the cleanroom. Anticipated Construction Start/Finish 08/2026 to 10/2027 Question Deadline 12/09/2024 at 5:00 PM MT Questions are submitted online Yes, Respondent initiated email requests for clarification will be received any time on or before time Questions to be submitted via online. See schedule above. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information. Confirmed Shortlist

Pre-Construction/Negotiated

Educational

$10,300,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
120
Bidding Soon
1,639
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

August 3, 2026

Project location map

4001 Discovery Dr, Boulder, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.