Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Renovation of an educational facility in Palmer, Alaska. Working plans call for the renovation of a educational facility.

**As of APRIL 8 , 2025 this project cancelled but no definite date for the rebid.** Deadline for Questions: Thursday, February 20, 2025 by 5:00 PM Questions or requests for clarifications shall be directed to the Borough's Purchasing Officer at purchasing@matsugov.us. Questions or requests for clarification directed to any other member of the borough staff, or consultant may be grounds for rejection of bid as being irregular. The Matanuska-Susitna Borough (MSB) is soliciting proposals from qualified Contractors to provide design build services to upgrade the Colony Middle School Boiler Pumps and Controls at 9250 E. Bogard Rd, Palmer, Alaska. Pre-Bid / Site Inspection 9250 E. Bogard Rd, Palmer, Alaska The Matanuska-Susitna Borough will host a site visit to give potential bidders the opportunity to verify existing conditions and the work's nature. Any discrepancies between the conditions existing and those herein specified must be reported in writing. The Borough is not responsible for any discrepancy not reported. The project site will be shown to interested parties on Wednesday, February 19, 2025, at 10:00 a.m. onsite. Any questions will be answered in an addendum. It is highly recommended that contractors bidding on this project attend the pre-bid site visit. Feb 19th 2025, 10:00 AM AKST - Feb 19th 2025, 11:00 AM AKST The project shall be substantially complete no later than August 1, 2025. Final Completion date shall be no later than September 1, 2025. The Matanuska-Susitna Borough (MSB) is soliciting proposals from qualified Contractors to provide design build services to upgrade the Colony Middle School Boiler Pumps and Controls at 9250 E. Bogard Rd, Palmer, Alaska. The existing boiler pumps and controls are outdated, reaching the end of their life expectancy, and upgrades will ensure reliable heating and operational efficiency. The scope will require a mechanical plumbing and heating contractor working with a professional engineer to develop design drawings and documents needed for equipment upgrades. The new pumps, valves and drives will need to be incorporated into the existing Siemens automation infrastructure for remote control operation and alarm monitoring. The Contractor must complete installation of all equipment while school is out between June 2025 - August 2025. Kick-Off / NTP Meeting March 31, 2025 Substantial Completion of Construction NLT August 1, 2025 Final Completion NLT September 1, 2025 BUDGET The MSB estimates these services to be less than $250,000.00

Final Planning

Educational

$561,624.00

Public - City

Renovation

243

8

4

6

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
148
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2025

October 14, 2025

Project location map

9250 E Bogard Rd, Palmer, AK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.