Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a civil project in Neelyville, Missouri. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.
Bridge replacements over Harviell Drainage Ditch, Hart Drainage Ditch and Neelyville Drainage Ditch. Project involves bridges F0665, K0982 and K0983 Length : 0.60 Route : US 67 County : Butler Award Date : 2027 As of October 03, 2024, the project is in Conceptual status. Anticipated letting Year is 2027. MODOT - Bridge Replacement - US 67 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$4,434,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2027
US-67, Neelyville, MO
Related To This Project
Neelyville, MO
--
Neelyville, MO
Bid Date: Nov 06 2024
Neelyville, MO
Bid Date: Nov 06 2024
Neelyville, MO
Bid Date: Feb 15 2023
Neelyville, MO
--
Neelyville, MO
--
Neelyville, MO
Bid Date: Sep 14 2022
Neelyville, MO
Bid Date: Aug 20 2020
Neelyville, MO
Bid Date: Sep 14 2022
Poplar Bluff, MO
--
Poplar Bluff, MO
--
Springfield, MO
Bid Date: Oct 29 2024
Poplar Bluff, MO
--
Springfield, MO
--
Springfield, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.