BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a civil project in Neelyville, Missouri. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

Contract #1: Construction of a new municipal drinking water well to an estimated depth of 700-feet, with well pump, motor, pitless well unit, and all other necessary appurtenances to provide a complete-in-place public drinking water supply well. Contract #2: Stripping and repainting of the existing 50,000-gallon elevated storage tank, construction of a new 8" storage tank fill pipe, and other miscellaneous water storage tank rehabilitation measures to meet regulatory compliance. Contract #3: Water distribution system improvements, including the installation of approximately 16,750-feet of 6" SDR-21 PVC piping, 3,600-feet of 3" SDR-21 PVC piping, installation of a new pressure-regulating station, along with new water meters, service lines, road bores, valves, hydrants and other appurtenances as necessary for a fully functional water distribution system. Also includes construction of a new well house, complete with internal piping, flowmeter, and controls for a fully functional municipal water supply well house, as well as chain-link security fencing with gate around the property boundary of the well house and storage tank site. Est. Completion Date: April 30, 2026 Question Deadline 10/28/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Submit all requests to the Heartland Engineering, LLC Project Engineer in email form Questions received less than seven days prior to the date for opening of Bids may not be answered

Bid Results

Water / Sewer

$169,225.00

Public - City

New Construction, Site Work

53

22

16

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
13
Bidding Soon
216
All Active Projects
78
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

January 6, 2025

img_map_placeholder

Multiple Locations, Neelyville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.