Saving Project...

Published October 25, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Broken Arrow, Oklahoma. Completed plans call for the renovation of a educational facility.

Broken Arrow Public Schools - High School Fine Arts Renovation Project All bids are to be sealed and CLEARLY labeled by describing the project and indicating the package being bid, on the envelope as described in the Instructions to Bidders. A Bid Security, as stipulated in the bid documents, in the amount of 5% of the bid shall accompany the sealed proposal of each bidder if the amount of the bid exceeds $50,000. Please contact Brittney Driskill (bdriskill@flintco.com) Kyle Rhine (kyle.rhine@flintco.com) with Flintco at (918) 587-8451 with any questions about bid procedures or documents. The scope of work of this bid package shall also include the following items, but without limiting the scope of work as provided above: 1.) This bid package is intended to be all inclusive of labor and equipment required for select building and site demolition. Provide site demolition, including, but not limited to, curb and gutter removal, asphalt and concrete paving removal, sidewalk removal, concrete steps and pads, fencing, gates, screen walls, canopies along with supporting structure, etc. in accordance the Contract Documents. 2.) Selective demolition specifically, but not limited to, the following items: a. Existing structure (foundations, structural steel, exterior walls, roof, etc.) b. Interior and Exterior masonry or CMU c. Ceilings d. Flooring n carpet, VCT, sheet vinyl, tile, etc. e. Wall tile f. Walls/Columns (Interior and Exterior, gypsum/metal framing and masonry) and as required to accommodate new structural supports at existing building. g. Interior and Exterior Doors and Frames h. Millwork, cabinetry, and furniture i. Specialties j. Toilet Partitions k. Signage l. Interior and Exterior Windows/ Glass and Glazing 3.) Include sanding, adhesive and mastic removal at existing floors to bare concrete/CMU/brick/drywall. 4.) Layout areas of wall to be removed for new steel and coordinate with steel subcontractor. 5.) Layout areas of wall to be removed for new walls and coordinate with drywall subcontractor. 6.) Coordinate demo for new openings in existing walls with correct opening dimensions and conditions and also allow for new MEP above new ceiling line to penetrate existing walls. 7.) For openings in existing walls, lay-out new opening, saw cut existing material and remove existing portions of wall. Coordinate opening with supplier or installer. 8.) Coordinate demolition with Mechanical, Electrical, and Fire Sprinkler contractors for locations and termination of services in demolition areas. Contractor to coordinate schedule dates with the appropriate subcontractors and the Construction Manager. 9.) Contractor to demolition the existing building concrete decks, elevated slabs, elevator pits and walls, concrete and steel beams, concrete walls, concrete columns, concrete slabs and concrete footings as shown on the Contract Documents and detailed on the Structural Drawings as required for a minimal disturbance to existing structure. Include chipping, saw cutting, and removal in accordance with the Contract Documents. 10.) Include sawcut and removal of the existing slabs shown on the demolition drawings for MEP. Layout of areas to be removed will be confirmed by MEP subcontractors. See structural drawings for footings in existing slab areas

Post-Bid

Educational

$3,500,000.00

Public - City

Renovation

91

27

103

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Mockups, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Air Barriers, Roofing and Siding Panels, Membrane Roofing, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping, Fire-Resistant Joint Sealants, Joint Protection, Joint Sealants, Acoustical Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Windows, Special Function Windows, Sound Control Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Bedroom Furnishings, Blankets, Rugs and Mats, Runners, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
59
Bidding Soon
755
All Active Projects
355
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 25, 2024

img_map_placeholder

1901 E Albany St, Broken Arrow, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Broken Arrow PS High School Fine Arts

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.