Published January 10, 2025 at 7:00 PM

Updated January 11, 2025

Renovation of a municipal facility in Dedham, Massachusetts. Completed plans call for the renovation of a municipal facility.

Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Norfolk County Dedham District HVAC Building Management System in accordance with MGL CH149, Section 44A through Section 44J, as amended. To be eligible and responsible to bid on this project, General Bidders shall submit with their bid a current Certificate of Eligibility for EITHER Heating, Ventilating and Air Conditioning OR Energy Management System issued by the Division of Capital Asset Management and Maintenance, DCAMM (formerly the Division of Capital Planning and Operations, DCPO), together with an Update Statement. Question Deadline 12/02/2024 Every request for such interpretation should be in writing and emailed to Purchasing@norfolkcounty.org The project work consists of replacing aged HVAC equipment utilizing existing duct and utility connections including new equipment support sleepers with EPDM covers and roof patching. Provide transformers, thermostats, actuators, dampers, sensors, equipment, controllers, and accessories as required to meet the system requirements shown on the drawings and in the specifications. B. C. D. E. F. G. H. 1.4 A. B. C. General Project Information : Provide an overall electronic building management system to regulate and monitor existing heating, ventilating, and air conditioning systems to meet the requirements of the sequence of operations shown on the drawings and in the specifications. The project will include the replacement of two interior air handling units, three exterior rooftop air cooled condensing units, and one rooftop unit. The work will include all operations necessary to deliver the building and ancillary on and off site amenities in a fully installed and operable condition including all utility and site work and obtaining all necessary licenses, permits, and certificates. Where utilities exist within and adjacent to the building(s) and ancillary parking lots, and are known by the Owner, they have been shown on the site plan(s) appearing in, but not restricted to, the exhibits. Connections to these existing utility lines will be the responsibility of the Contractor. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to, the following major work: 1. 2. 3. 4. Replacement of mechanical equipment and connections to existing ductwork and utilities. Roof patching Installation of a new electronic building management system Patching and painting of walls, ceilings, trim, equipment, etc. to match existing condition. Reference To Drawings: The work to be done under this Contract is shown on the Drawings listed at the end of this Section. The Contractor shall provide a schedule for completion of the project within the construction period set forth in the Contract. The Massachusetts Standard Labor Wage rates contained in the Contract Documents, as updated on an annual basis, will be used throughout the construction of this project. Date of Substantial Completion: Friday, May 16, 2025. EXAMINATION OF SITE AND DOCUMENTS For information related to a pre-bid conference, if any, refer to the Bid Instructions for Bidders as amended. Bidders interested in visiting the site to visually inspect the location of the work and existing conditions that may affect new work may only visit the site on a non-holiday weekday pre-arranged and agreed to by and with the Owner. The bidders are expected to examine and to be thoroughly familiar with all contract documents and with the conditions under which the work is to be carried out. The Owner will not be responsible for errors, omissions, and/or charges for extra work arising from the Contractors or Subcontractors failure to familiarize themselves with the contract documents. The Contractor and Subcontractor acknowledge that they are familiar with the conditions and requirements of the contract documents where they require, in any part of the work a given result to be produced, and that the contract documents are adequate and will produce the required results 1.5 1.6 1.7 1.8 CONTRACTOR QUALIFICATION A. B. A. A. A. B. C. D. The Contractor must be currently certified by the Division of Capital Asset Management and Maintenance (DCAMM) for Heating, Ventilation, and Air Conditioning. It is the firm s responsibility to obtain the necessary forms from DCAMM and make application to DCAMM not less than three weeks prior to advertised bid opening for DCAMM to evaluate the application and issue the required Certificate of Eligibility. CONTRACT METHOD Work under this contract shall be a lump sum price for the scopes of work as described in these Specifications and shown on the Drawings. SUPERVISION OF WORK The Contractor shall be held directly responsible for the correct installation of all work performed under this Contract. The Contractor must make good repair, without expense to the Owner, of any part of the new work, or existing work to remain, which may become inoperative on account of leaving the work unprotected or unsupervised during construction of the system or which may break or give out in any manner by reason of poor workmanship, defective materials or any lack of space to allow for expansion and contraction of the work during the Contractor's warranty period, from the date of final acceptance of the work by the Owner

Award

Municipal

$759,250.00

Public - County

Renovation

18

15

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Roof Windows and Skylights
Division 09 - Finishes

Division 09 - Finishes

Flooring, Wood Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
650
Active Projects
354
Bidding Soon
4,488
All Active Projects
1,960
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

img_map_placeholder

631 High St, Dedham, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.