BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2024 at 7:00 PM

Updated December 6, 2025

Site work and paving for a civil project in Battle Ground, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Sealed bids for the Tukes Mountain Reservoir No. 6 (CP-WA-2022-01) project and other related work Work consists of furnishing all labor, materials and equipment necessary for construction of the new Tukes Mountain Reservoir No. 6, a 106-foot diameter, 2.5 million gallon ground level welded steel potable water storage reservoir. Construction includes, but is not limited to, demolition and removal of three existing concrete reservoirs, site clearing and excavation including rock blasting and removal, site water piping improvements, new electrical and controls, and construction of site improvements including new paved access road, retaining walls and stormwater facilities. City Council shall proceed to award the contract to the lowest bidder, responsive and responsible bidder but may reject any or all bids if, in its opinion, good cause exists, therefore, to waive informalities in the bidding and to accept the bid from the lowest responsible bidder. The City of Battle Ground reserves the right to reject any or all proposals received and to negotiate with any or all consultants on modifications to proposals. The City of Battle Ground's standard Professional Services Agreement is attached to this RFQ so the Consultant is aware of the City's requirements prior to participating in this process. Also, attached is the project report from the last upgrades made to the Intertie facility. The City and the Contractor hereby agree as follows: 1. SCOPE OF WORK. The Contractor shall furnish all of the material and perform all of the work for: Construction of the new Tukes Mountain Reservoir No. 6, a 106-foot diameter, 2.5 million gallon ground level welded steel potable waterstorage reservoir. Construction includes, but is not limited to, demolition and removal of three existing concrete reservoirs, site clearing and excavation including rock blasting and removal, site water piping improvements, new electrical and controls, and construction of site improvements including new paved access road, retaining walls and stormwater facilities.

Bid Results

Roads / Highways

$5,199,008.00

Public - City

Paving, Site Work

70

27

14

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
47
Bidding Soon
1,017
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

November 29, 2024

Project location map

Multiple Locations, Battle Ground, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.