BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2024 at 8:00 PM

Updated October 9, 2024

Site work for a water / sewer project in Bedford Hts, Ohio. Conceptual plans call for site work for a water / sewer project.

General Description of Work Cleveland Metroparks is seeking a Design-Builder to provide professional design and construction services for the Wood Creek Fish Passage and Stabilization Project ("Project") in the Bedford Reservation. The Project seeks to modify an existing fish barrier and install a rock ramp for fish passage on Wood Creek located in the Tinker's Creek watershed, Cuyahoga River Area of Concern. The Project will improve fish passage and replace failing gabion baskets downstream of the barrier with a bioengineered approach that will improve stream and riparian habitat and resiliency. The Design-Builder will be responsible for design, permitting, and development of construction documents; as well as due diligence including survey, geotechnical evaluations, historical and cultural resource management, and stream and field evaluations. The Design-Builder will assist Cleveland Metroparks with preparation of a QAPP for design, construction, and future monitoring activities. Additionally, the Design-Builder will be responsible for construction activities including but not limited to, construction oversight, site access, traffic maintenance, stream restoration, streambank stabilization, fish barrier demolition and site restoration. Scope of Work The selected Design-Builder will develop construction documents and estimates for construction, means and methods for construction and will construct the Project. It is anticipated that the DesignBuilder will be performing the majority of the work via self-performed work, which will be achieved through a competitive process. The Design-Builder shall familiarize themselves with the "DesignAssist" process which will likely be utilized for the Project. Cleveland Metroparks, its Stakeholders, and the Design-Builder will work collaboratively to execute the Project with a focus on design quality and workmanship, cost, and adherence to the Project schedule. October 25, 2024, 5:00 p.m. (EDT) Deadline for written questions from firms entered into online October 28, 2024, 5:00 p.m. (EDT) Responses to questions posted into online. Construction Commencement October 2026 Construction Complete April 2027 Cleveland Metroparks reserves the right, in its sole discretion, to negotiate or to reject any and all Statements and parts of any and all Statements and waive all technicalities.

Conceptual

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
412
Active Projects
256
Bidding Soon
2,070
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

Project location map

18753 Egbert Rd, Bedford Hts, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.