BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2024 at 7:00 PM

Updated December 21, 2024

Site work, paving and outdoor lighting for a mixed-use development in Braselton, Georgia. Completed plans call for site work for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The installation of approximately 5,000 L.F. of 8-foot-wide gravel slate chip trail with recycled plastic railroad tie side rails, weed control barrier, signage, picnic tables, water fountains, police call boxes, concrete bench pads, and dog waste receptacles. Site work includes clearing, grubbing, light grading, drainage improvements, and erosion control measures. Neither Owner, Owner's Advisor, nor Engineer will be responsible for Proposal Documents, including addenda, if any, obtained from sources other than from Engineering Management, Inc. The CMAR Contract will include preconstruction services, procurement services (equipment), subcontractor procurement, and construction services. OWNER anticipates that the CMAR's Contract Price will be approximately $1,783,000. The CMAR Contract duration for construction is planned to be 180 days. Question Deadline 10/23/2024 at 5:00 PM ET Questions regarding this RFQ shall be received no later than. The package will consist of the RFQ, Design Drawings, technical specifications, and the Geotechnical Report. Hard copies and electronic (PDF) files are available.

Award

Roads / Highways

$1,783,000.00

Public - City

Outdoor Lighting, Paving, Site Work

11

11

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
88
Bidding Soon
2,092
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

February 28, 2025

Project location map

To Be Determined, Braselton, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.