BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Braselton, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The approximate extent and character of the Work is generally described as follows: Approximately 1.89 miles of asphalt patching, resurfacing, and striping on Spout Springs Road, Olney Falls Drive, Blue Ash Court, Red Mulberry Lane, and Perimeter Circle in the Town of Braselton, GA. The initial contract term will be November 15, 2024 through November 14, 2025 followed by four (4) one-year renewals contingent upon the appropriation of funds by the Town of Braselton in the annual budget for such fiscal year. All engineering and technical questions should be directed to Jacob Hughes, P.E., at jacob@bmandkinc.com. The Owner of the project is the Town of Braselton. The Engineer for the project is BM&K Construction & Engineering. The time allowed for Substantial Completion is 30 consecutive days from the date specified in the Notice to Proceed. Nonrefundable liquidated damages in the amount of $300 per calendar day will be deducted from monies due the Contractor in the event that a portion of the work remains incomplete beyond the agreed upon contract completion date. The official Notice to Proceed is anticipated to be the given to the chosen contractor in the Spring of 2024. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish a performance bond for 100% of the contract amount and a payment bond for 100% of the contract amount, with the executed Agreement meeting the requirements of the Contract The initial contract term will be November 15, 2024 through November 14, 2025 followed by four (4) one-year renewals contingent upon the appropriation of funds by the Town of Braselton in the annual budget for such fiscal year. Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Requests for payments are due by the Fifth (5th) of the month for the payment by the Twentieth (20th) of the month less 10% retainage. Retainage will be held until final acceptance of the project by the Town of Braselton. All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. All work performed for this project shall be in accordance with Georgia Department of Transportation Standard Specifications for Construction of Roads and Bridges, 2021 Edition, or current edition and attached modifications and special provisions The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. bid date info : If bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the OWNER. The mailing address is P.O. Box 306 Braselton, GA 30517. Bids may be hand-delivered to Town of Braselton Town Hall at 4982 Highway 53, Braselton, Georgia 30517.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

3

5

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
66
Bidding Soon
1,487
All Active Projects
678
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 15, 2024

img_map_placeholder

Multiple Locations, Braselton, GA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.