Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Braselton, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The approximate extent and character of the Work is generally described as follows: Approximately 1.89 miles of asphalt patching, resurfacing, and striping on Spout Springs Road, Olney Falls Drive, Blue Ash Court, Red Mulberry Lane, and Perimeter Circle in the Town of Braselton, GA. The initial contract term will be November 15, 2024 through November 14, 2025 followed by four (4) one-year renewals contingent upon the appropriation of funds by the Town of Braselton in the annual budget for such fiscal year. All engineering and technical questions should be directed to Jacob Hughes, P.E., at jacob@bmandkinc.com. The Owner of the project is the Town of Braselton. The Engineer for the project is BM&K Construction & Engineering. The time allowed for Substantial Completion is 30 consecutive days from the date specified in the Notice to Proceed. Nonrefundable liquidated damages in the amount of $300 per calendar day will be deducted from monies due the Contractor in the event that a portion of the work remains incomplete beyond the agreed upon contract completion date. The official Notice to Proceed is anticipated to be the given to the chosen contractor in the Spring of 2024. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish a performance bond for 100% of the contract amount and a payment bond for 100% of the contract amount, with the executed Agreement meeting the requirements of the Contract The initial contract term will be November 15, 2024 through November 14, 2025 followed by four (4) one-year renewals contingent upon the appropriation of funds by the Town of Braselton in the annual budget for such fiscal year. Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Requests for payments are due by the Fifth (5th) of the month for the payment by the Twentieth (20th) of the month less 10% retainage. Retainage will be held until final acceptance of the project by the Town of Braselton. All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. All work performed for this project shall be in accordance with Georgia Department of Transportation Standard Specifications for Construction of Roads and Bridges, 2021 Edition, or current edition and attached modifications and special provisions The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. bid date info : If bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the OWNER. The mailing address is P.O. Box 306 Braselton, GA 30517. Bids may be hand-delivered to Town of Braselton Town Hall at 4982 Highway 53, Braselton, Georgia 30517.
Post-Bid
Roads / Highways
$2,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2024
November 15, 2024
Multiple Locations, Braselton, GA
Related To This Project
Braselton, GA
Bid Date: Oct 31 2024
Braselton, GA
--
Braselton, GA
Bid Date: Nov 14 2024
Braselton, GA
--
Braselton, GA
Bid Date: Oct 23 2024
Braselton, GA
Bid Date: Oct 03 2024
Braselton, GA
Bid Date: Oct 18 2024
Braselton, GA
Bid Date: Jul 28 2021
Braselton, GA
Bid Date: Aug 06 2024
Braselton, GA
Bid Date: Jul 23 2024
Braselton, GA
Bid Date: Aug 19 2024
Braselton, GA
Bid Date: Jun 21 2024
Braselton, GA
Bid Date: May 01 2024
Braselton, GA
Bid Date: Apr 11 2024
Braselton, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.