Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Newport, Vermont. Conceptual plans call for the renovation of a detention facility.
QUESTIONS DUE October 30, 2024 - 4:30 PM (EST) Any bidder requiring clarification of any section of this RFP or wishing to comment on any requirement of the RFP must submit specific questions in writing no later than the deadline for question indicated on the first page of this RFP. At the close of the question period a copy of all questions or comments and the State's responses will be posted on the States web site online. SCOPE AND BACKGROUND: Through this Request for Proposal (RFP) the Office of Purchasing & Contracting (hereinafter the "State") seeks to establish a contract with a qualified Architectural and/or Engineering firm to provide architectural and engineering design services for a new chip boiler system at Northern State Correctional Facility (NSCF) located at 2559 Glen Road, Newport, VT. Interested firms are invited to bid on providing architectural/engineering design services described in Section 2 of this RFP. The Northern State Correctional Facility is a 416-bed facility consisting of nine (9) buildings spanning 137,368 square feet and was originally constructed in 1991. During the heating season, the primary heat and domestic hot water is provided by two chunk wood-fired hot water boilers. These boilers pre-heat the water for the two oil-fired domestic hot water oil boilers and the two oil boilers in the basement that supply heat to the facility. Propane is used for igniting the oil boilers. There are a variety of different hot water- supplied heating units throughout the facility including AHU's, unit heaters, and fin tube radiators. The existing chunk wood boilers are nearing end of life and need replacement. The chuck wood boilers are hand loaded by incarcerated individuals. It is the intent of this project to design a new and modern heating system that eliminates the need for hand loading or operating. The new chip boiler system must be supported by a secondary back-up system. The scope of this RFP is to review the current systems as well as the Heat Plant Feasibility Study that was completed April 2024. Design a new wood chip boiler system as the primary heating system, with backup, and reducing the need for the existing oil systems. The domestic hot water supply will also be provided by the new heat system and will require a backup, as the facility operates around-the-clock and may not be without heat or hot water for extended (> 4 hours) periods of time. The backup system must support the entire facility in the event the primary system loses functionality. CONTRACT PERIOD: The period of performance under this contract shall commence on 1/2/2025, and end on 1/30/2028, with a Substantial Completion date of 1/30/2027, a Project Completion date of 6/30/2027, and a Contract Completion date of 1/30/2028, to allow for one year warranty inspection(s) as may be required of the construction contract work. Construction Start Date 4/1/2026. Construction Substantial Completion 1/30/2027.
Conceptual
Jails / Prisons
$7,000,000.00
Public - State/Provincial
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2025
2559 Glen Rd, Newport, VT
Related To This Project
Newport, VT
Bid Date: Nov 12 2024
Newport, VT
Bid Date: Oct 21 2024
Newport, VT
Bid Date: Oct 21 2024
Newport, VT
Bid Date: Aug 28 2024
Newport, VT
Bid Date: Jul 19 2024
Newport, VT
Bid Date: Jan 24 2024
Newport, VT
Bid Date: Sep 28 2023
Newport, VT
Bid Date: Mar 28 2022
Newport, VT
--
Testing & Inspection Services for Northern State Correctional Facility Grease Trap Project - 5151190
Newport, VT
Bid Date: Aug 31 2023
Newport, VT
Bid Date: Jun 22 2023
Newport, VT
Bid Date: Aug 22 2023
Newport, VT
Bid Date: Aug 16 2024
Newport, VT
Bid Date: Feb 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.