Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Flint, Michigan. Completed plans call for the renovation of a municipal facility.
Reference Number 0000367028 Through this ITB, Genesee County ("the County") is soliciting bids from qualified firms who can provide and install fiber cabling from McCree Building to Genesee County Tower Building, as requested by Genesee County Information Technology Department. Job Location Genesee County, 1101 Beach St., Flint, MI 48502 Question Deadline 10/31/2024 at 5:00 PM ET Questions are submitted online No General Requirements - Bid Deposit Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % Work will consist of providing and installing fiber cabling from the McCree Building's 2nd floor MDF (630 S. Saginaw St) to the new Genesee County Tower Building's basement MDF (324 S. Saginaw St). The County has reviewed two (2) methods in which this cabling can be installed. Contractors may bid on either option or both. Work is to include the following: McCree to the Tower Path: o Provide and install (1) 288 strand single mode indoor / outdoor plenum fiber optic cable. o Provide and install LC fusion splice pigtails at both ends for 12 strands for McCree to the Tower. o Provide and install Corning wall mount termination boxes at both ends for McCree and the Tower. o Provide and install Corning LC adaptor panels at both ends for McCree and the Tower. o Provide labeling, testing, and certification. o Provide and install firestop where required. o Provide and install (1) one underground conduit for the fiber between McCree and the Tower. o Provide and install handholes to access the fiber where appropriate. o Underground bore from the McCree Building (630 S. Saginaw St) up Beach St to the Genesee County Tower Building (324 S. Saginaw St) Alternate suggestions for the pathway would be considered. Fiber will run from the 2nd floor MDF of the McCree building to the basement MDF of the Genesee County Tower building.
Post-Bid
Municipal
$50,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2024
December 9, 2024
Multiple Locations, Flint, MI
Related To This Project
Flint, MI
Bid Date: Nov 04 2024
Flint, MI
Bid Date: Oct 18 2024
Flint, MI
Bid Date: Nov 13 2024
Flint, MI
Bid Date: Dec 19 2024
Flint, MI
Bid Date: Dec 03 2024
Flint, MI
Bid Date: Nov 04 2024
Flint, MI
Bid Date: Nov 04 2024
Flint, MI
Bid Date: Oct 08 2024
Flint, MI
Bid Date: Oct 11 2024
Flint, MI
--
Flint, MI
Bid Date: Oct 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.