BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Inkster, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number : 0000364638 The Project consists of various manhole and pipe rehabilitation measures in the City of Inkster in an area generally located north of Avondale Street, south of Cherry Hill Road, east of Inkster Road. Most of the project is located within dense residential neighborhoods. Easement access is required through individual properties and, due to the challenges associated with rear yard obstacles, access to manholes is limited. Excavations and related support will be required for select assets, and as such, great care must be taken to minimize disruption. Prospective Bidders are encouraged to visit the site to formulate a plan of action for access to manholes and proposed work. Approximately 15,500 linear feet of pipe, ranging in size from 8" to 15", are proposed to be fully or partially lined with a cured-in-place pipe liner and an additional 2,200 linear feet of pipe is proposed to be fully lined following spot open cut repairs. Furthermore, approximately 55 manholes are proposed for structural or O&M coatings. These manholes are generally adjacent to piping in the project scope. There will be a 1-year option at the City's sole discretion for additional work of similar size and scope. Additional work will be similar in cost and quantity, and located in another similarly localized area within the City of Inkster. The Contractor will be informed by June 1, 2025, if the City intends to extend the contract. The contract will be quantified and provided to the Contractor prior to contract renewal, which is expected months following notice of intent to renew. Contractors are expected to hold unit prices for the option year. Question Deadline 10/16/2024 at 5:00 PM ET , Questions are submitted online : No. For any specific questions regarding this advertisement, please contact Project Manager Brent Kraft at 248-598-5178 or bkraft@giffelswebster.com by 5:00PM Wednesday, October 16, 2024. Questions received after this time will not be answered. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 50 % - Payment Bond 100 % General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

59

18

6

4

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
80
Bidding Soon
1,414
All Active Projects
576
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

December 5, 2024

img_map_placeholder

Multiple Locations, Inkster, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.