BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Anaheim, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of November 19, 2024, This project has been awarded to MNR Construction, Inc., with the awarded amount of $4,354,545.20.** Online Q&A Yes Q&A Deadline 10/17/2024 2:00 PM (PDT) The sewer improvement project (Project) described herein consists of the installation of new 18-inch and 21-inch sewer line in Knollwood Circle as well as in a new 15-foot sewer easement through 1201 N Magnolia Ave and 1200 N Knollwood Circle. The work incudes installation of new sewer manholes, concrete curb and gutter, sidewalk replacement, and pavement rehabilitation and all appurtenant work necessary for the proper construction of the proposed improvements. The goal of this project is to address a sewer deficiency that was identified as part of the Western Anaheim Sanitary Sewer Master Plan Study. The work consists of, but is not limited to, sewer pipeline removal, disposal and abandonment; sewer manhole removal, disposal, abandonment, modification, and construction (trenchless and open-cut); connection of existing service laterals to the proposed sewer pipeline; sewer bypassing to maintain sewer service; adjusting existing utility vaults, valve boxes and pull boxes to grade; trench restoration; sheeting, shoring, and bracing; grind and cap paving; traffic control; implementation of a Water Pollution Control Program and Best Management Practices; and all appurtenant work as shown on the plans and delineated in the specifications. Liquidated Damages $1,750 per Working Day Estimated Bid Value $4,139,000 Project Duration 160 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%

Award

Water / Sewer

$4,354,545.00

Public - City

Paving, Site Work

34

25

2

4

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
110
Bidding Soon
2,334
All Active Projects
1,041
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.