BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Pasadena, California. Completed plans call for site work for a water / sewer project.

**As of November 20, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Questions must be submitted via the City's eProcurement Portal. Any questions submitted after 10:00 am on Tuesday, October 15, 2024 will not be answered. Contact Information Bernardo Navarrete Assistant Engineer Email: bnavarrete@cityofpasadena.net Phone: (626) 744-4265 The Department of Public Works has prepared specifications for the Annual Storm Drain Project FY 2025 in the City of Pasadena. The scope of work includes cleaning and debris removal of City owned catch basins and storm drain lines, slip-lining or replacement of storm drain pipes, reconstruction of; storm drain catch basin decks, culverts, manholes and construction of a new headwall. The scope includes an add alternate for a 48" HDPE storm drain pipe replacement at Brookside Park. The work to be performed consists of the Contractor furnishing all materials, equipment, tools, labor, and incidentals necessary for the construction of the proposed project, complete in place in accordance with the contract drawings and specifications and subject to the terms and conditions of the Contract. The work to be performed includes, but is not limited to furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents for the Annual Storm Drain Project FY 2025 (76920) project. The Work includes: Cleaning and debris removal of City owned catch basins and storm drain lines, slip-lining or replacement of varying sized storm drain pipes, reconstruction of; storm drain catch basin decks, culverts, manholes, construction of a concrete headwall; and miscellaneous appurtenant work. The scope also includes an add alternate for a 48" HDPE storm drain pipe replacement at Brookside Park. Such other items or details not mentioned above that are required by the Standard Specifications, or these Special Provisions, shall be performed, placed, constructed, or installed, and the total contract bid price submitted shall include the cost of all such incidentals even though they are not specifically mentioned in the preceding description of work or in the Bidder's Proposal. CONTRACTOR shall provide safe and adequate pedestrian access at all times. Vehicular movement at and around all construction sites shall be provided and maintained at all times. Approved barriers and signs (traffic flagging personnel, if necessary), shall be furnished and utilized by the CONTRACTOR to ensure safety and public access to businesses at all times. Contract Documents - The following documents are also included on this contract: Drawing No. 6843 - Location Exhibits Pasadena Standard Plans: S-102 | Double Frame & Cover for Sidewalk Culverts S-106 | Double Box Culverts for Sidewalks S-109 | Culvert Openings and Appurtenances S-299 | Supporting Water Pipe Encountered During Excavation Operations S-402 | Driveway-Curb Return Type S-403 | Driveway-Dustpan Type S-406 | Curb and Gutter S-416 | Restoration of Asphalt Street Excavations S-417 | Restoration of Concrete Street Excavations S-421 | PCC Sidewalk S-426 | Minimum Public Safety Requirement for Open Excavations S-976 | Vehicle and Bicycle Loop Detector Installation SPPWC Standard Plans: 203-3 | Brick Sewer Manhole 210-4 | Manhole Frame and Cover Locking Type 224-3 | Supports for Conduits Across Trenches 300-4 | Curb Opening Catch Basin 310-4 | Catch Basin Face Plate Assembly and Protection Bar 313-4 | Local Depressions at Catch Basins 321-2 | Manhole Pipe-to-Pipe 360-2 | Sloped Protection Barrier Los Angeles County Department of Public Works (LADWP) 2027-1 | Allowable Trench Widths 3080-2 | Pipe Bedding in Trenches 3090-1 | Criteria for the Design of Shoring for Excavations California Transportation Standard Plan: D89A | Pipe Culvert Headwalls Straight and "L"

Post-Bid

Water / Sewer

$222,000.00

Public - City

Site Work

5

6

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
107
Bidding Soon
2,240
All Active Projects
1,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 25, 2024

img_map_placeholder

Multiple Locations, Pasadena, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.