BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2024 at 7:00 PM

Updated December 3, 2024

Site work for a water / sewer project in Yorba Linda, California. Completed plans call for site work for a water / sewer project.

Site Directions: Starting at the Intersection of Via Lomas De Yorba W and Copper Canyon Rd in the City of Yorba Linda (North of E La Palma Ave) Est. Completion Date: April 2, 2025. The District owns and maintains a 16-inch cement mortar lined and coated steel waterline that is located on Copper Canyon Road and the hillside from Via Lomas De Yorba Way to Ave De Michelle in the City of Yorba Linda. The existing 16-inch waterline has had two recent breaks, with one occurring in late October of 2023 and the other shortly thereafter in November of 2023. The distance between the two breaks was approximately 50 feet. District staff was able to perform CCTV video inspection on 1,160 linear feet of the waterline. The results of the video inspection indicated a high potential of future breaks. Approximately 1,980 linear feet of the 16-inch waterline will have to be rehabilitated. The work includes 1,813 LF Flexible Fabric Reinforced Pipe (FFRP) Liner installation. In addition, the District owns and maintains a 24-inch cement mortar lined and coated waterline that runs parallel to the existing 16-inch waterline. These two waterlines are within different zones and the District is re-configuring the connection between them to make them redundant to each other, should the need arise in the future. Question Deadline Oct 22, 2024 at 6:00 pm All questions relative to this Project prior to the opening of bids shall be directed to the Owner's Representative for the Project: Reza Afshar, PE, PMP Yorba Linda Water District 1717 E. Miraloma Avenue Placentia, California 92870 rafshar@ylwd.com Approximately 1,800 LF of 16-inch liner installation (2 pressure classes 3 Access Pits Interconnection between 16-inch CML&C (pressure zone III) and 24-inch CML&C (pressure zone IV) parallel pipelines Sequencing the work is contractor's responsibility. Shutdowns will be done by YLWD's operations crew; however, they typically only follow the instructions that they receive from the project manager. The project manager and the contractor will need to work closely on this. Pothole and verify the exact location of sewer lines for Upper and Lower interconnections.

Award

Water / Sewer

$782,646.00

Public - City

Site Work

16

27

2

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
19
Bidding Soon
2,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

December 2, 2024

Project location map

Via Lomas De Yorba W & Copper Canyon Rd, Yorba Linda, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.