BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Yorba Linda, California. Completed plans call for site work for a water / sewer project.

Site Directions: Starting at the Intersection of Via Lomas De Yorba W and Copper Canyon Rd in the City of Yorba Linda (North of E La Palma Ave) Est. Completion Date: April 2, 2025. The District owns and maintains a 16-inch cement mortar lined and coated steel waterline that is located on Copper Canyon Road and the hillside from Via Lomas De Yorba Way to Ave De Michelle in the City of Yorba Linda. The existing 16-inch waterline has had two recent breaks, with one occurring in late October of 2023 and the other shortly thereafter in November of 2023. The distance between the two breaks was approximately 50 feet. District staff was able to perform CCTV video inspection on 1,160 linear feet of the waterline. The results of the video inspection indicated a high potential of future breaks. Approximately 1,980 linear feet of the 16-inch waterline will have to be rehabilitated. The work includes 1,813 LF Flexible Fabric Reinforced Pipe (FFRP) Liner installation. In addition, the District owns and maintains a 24-inch cement mortar lined and coated waterline that runs parallel to the existing 16-inch waterline. These two waterlines are within different zones and the District is re-configuring the connection between them to make them redundant to each other, should the need arise in the future. Question Deadline Oct 22, 2024 at 6:00 pm All questions relative to this Project prior to the opening of bids shall be directed to the Owner's Representative for the Project: Reza Afshar, PE, PMP Yorba Linda Water District 1717 E. Miraloma Avenue Placentia, California 92870 rafshar@ylwd.com Approximately 1,800 LF of 16-inch liner installation (2 pressure classes 3 Access Pits Interconnection between 16-inch CML&C (pressure zone III) and 24-inch CML&C (pressure zone IV) parallel pipelines Sequencing the work is contractor's responsibility. Shutdowns will be done by YLWD's operations crew; however, they typically only follow the instructions that they receive from the project manager. The project manager and the contractor will need to work closely on this. Pothole and verify the exact location of sewer lines for Upper and Lower interconnections.

Bid Results

Water / Sewer

$782,646.00

Public - City

Site Work

16

27

2

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
106
Bidding Soon
2,296
All Active Projects
1,029
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

December 2, 2024

img_map_placeholder

Via Lomas De Yorba W & Copper Canyon Rd, Yorba Linda, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.