Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 17, 2025 at 8:00 PM
Updated October 18, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Brigham City, Utah. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.
Tied Project(s) : F-R299(490)0 Project Location: Cnty:FA-1122; MP 5.21 - 5.39 Description : New Bridge/Bridge Replacement County: Box Elder This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code 13-8-5 (1) for More Information. DBE Goal:5.00% Wage Rates: Apply Engineer's Estimate: Greater than $1.5M but less than or equal $3M (Qualified Health Insurance Required) Each Bidder Must Submit an Electronic Bid Bond From an Approved Surety Company Through the Appropriate Clearinghouse, as Defined in the Udot E-bidding Guide, Using Udot's Bidding Business System or in Lieu Thereof, Cash, Certified Check, or Cashier's Check for Not Less Than 5% of the Total Amount of the Bid, Made Payable to the Utah Department of Transportation, Showing Evidence of Good Faith and a Guarantee That if Awarded the Contract, the Bidder Will Execute the Contract and Furnish the Contract Bonds as Required. The Right to Reject Any or All Bids is Reserved. As required, a contractor's license must be obtained from the Utah Department of Commerce to work on UDOT projects as defined from the Division of Professional Licensing. Project Plans Cannot Be Downloaded or Printed From the Website Unless Your Company is Registered With Udot. Go to Udot's Website to Register. UTDOT - BFP: Elwood Town Bridge Replacement (003040C) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (5.1%), WBE (6.9%), DBE (5%) All work to be completed by October 30th, 2026.
Award
Bridges / Tunnels
$1,675,097.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
December 1, 2025
Multiple Locations, Brigham City, UT
Related To This Project
Brigham City, UT
Bid Date: Oct 29 2024
Brigham City, UT
Bid Date: Nov 08 2024
Brigham City, UT
Bid Date: Jan 21 2025
Brigham City, UT
--
Brigham City, UT
--
Brigham City, UT
--
Brigham City, UT
Bid Date: Feb 20 2025
Brigham City, UT
--
Brigham City, UT
Bid Date: Sep 20 2024
Brigham City, UT
--
Brigham City, UT
Bid Date: Aug 16 2024
Brigham City, UT
--
Brigham City, UT
Bid Date: Aug 08 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
