BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Thetford Mines, Quebec. Contact the soliciting agency for additional information.

CFQC Sections 3 and 4 between Vallee-Jonction and Thetford Mines (including the crossing of the Riviere Chaudiere) are not in operation and require complete reconstruction of the structures, track, level crossings and culverts, over a total length of approximately 58 km. The project has been divided into two sections to make it easier to carry out: Section 3: Vallee-Jonction to Tring-Jonction, including the bridge over the Riviere Chaudiere and the sidings, turnarounds and customer connections slightly beyond Tring-Jonction (approximately 21 km); Section 4: Tring-Jonction to Thetford Mines (approx. 37 km). The Ministry is in the process of obtaining one or more agreements with sites for the recovery of asbestos waste (not polluted with hydrocarbons). Some of the culvert work is subject to restrictions on working in the water from 15 June to 15 September. TIMELINE: The owner has issued a notice of call for interest (NCI) for general contractors. Reference number: 20022386. Electronic tender submission accepted: No. The expression of interest must be submitted by a construction company with the resources (tools, supervision, skilled labor) for railway and culvert works. Plans and specifications will be provided. Two lots are considered a priori: • One lot covering section 3, approximately 21 km • One lot covering section 4, approximately 37 km One of the purposes of this NCI is to decide whether the division into 2 lots is relevant, or whether it is appropriate to provide more lots. Interested companies must have the resources available to begin work at the end of winter 2025, beginning of spring 2026. The Ministere des Transports et de la Mobilite durable (Ministere) is the owner of the Chemin de Fer Quebec Central (CFQC) located in the Beauce region between Charny and Thetford Mines. This is a single-track, non-electrified railway designed primarily for freight transport. Note: Sections 1 and 2 (partially) between Charny and Vallee-Jonction along the Chaudiere river are in operation and are not affected by the Notice of Call for Interest (NCI).

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
48
Bidding Soon
696
All Active Projects
332
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

img_map_placeholder

Multiple Locations, Thetford Mines, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.