BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Santa Monica, California. Completed plans call for the construction of a 12,868-square-foot educational facility; for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The Santa Monica-Malibu Unified School District (District) issues a Request for Qualifications and Proposals (RFQ/P) to invite the submission of statement of qualifications and proposals (Response(s)) from contractors to perform preliminary (preconstruction) services and construction services for the District's Franklin ES Early Education Classroom & site Improvements Project pursuant to the leaseleaseback delivery method. (Ed. Code, 17406.) The Projects construction cost is estimated to be between $25M and $28M The Franklin ES Early Education Classroom & site Improvements Project includes the construction of a new 12,868 SF, 1-story, type V-B building, which will house (4) Kindergarten classrooms, (3) Transitional Kindergarten classrooms, a Teacher Collaboration Room, and miscellaneous support spaces. This TK/K Classroom Building will be built with its associated fenced Play Yard of roughly 15,000 SF, of which approximately 4,500 SF is covered by a canopy. The scope of the project also includes the construction of a U-10 Soccer Field and Running track, a Fire Lane, and a new Staff Parking Lot. The project shall be constructed in 4 phases. This Project is subject to the March 2, 2017, Project Labor Agreement by and between the District and Los Angeles/Orange Counties Building and Construction Trades Council (PLA). A copy of the PLA is included in "ATTACHMENT 3 - District's Lease Leaseback Contract" of the issued RFQ/P. Contractors that intend to submit a Response to the RFQ/P must prequalify with the District by submitting the District's Prequalification Questionnaire through QualityBidders located at the website on or before above date; hold a Class B Contractors License that is current, valid, and in good standing with the California Contractor's State License Board, and meet the minimum project requirements noted within the RFQ/P. The successful contractor(s) shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if awarded a contract for the Project(s). The successful contractor(s) and its subcontractors shall pay all workers on the Project(s) not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to Labor Code sections 1770 et seq. Prevailing wage rates are available from the District or on the Internet at website. Contractors shall comply with the registration and qualification requirements pursuant to Labor Code sections 1725.5 and 1771.1 . If the District issues addenda to this RFQ/P, contractors are solely responsible for and must acknowledge receipt of addenda in the contractor's Response. Failure to acknowledge and respond to any addenda issued by the District may, in the District's sole discretion, render the contractor's Response to be deemed non-responsive. The District, at its discretion, may award the Project, as further set forth in the RFQ/P. Deadline for Contractors to submit questions regarding this RFQ/P October 25, 2024 no later than 3:00 PM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Educational

$28,000,000.00

Public - County

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
113
Bidding Soon
2,084
All Active Projects
956
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2024

June 15, 2026

img_map_placeholder

2400 Montana Ave, Santa Monica, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.