BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a fitness / recreation center in Santa Monica, California. Completed plans call for the renovation of a fitness / recreation center.

Question Deadline 11/12/2024 at 5:00 PM PT Should a Bidder find discrepancies in, or omissions from, the Contract Documents, or should the Bidder be in doubt as to their meaning, the Bidder shall at once notify the City and request an interpretation or clarification. Requests for clarifications must be entered into online "Question and Answer" tab on or before, Tuesday, November 12, 2024 by 5:00 pm. Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. . PROJECT ESTIMATE: $500,000.00 CONTRACT DAYS: 6 months, 182 days LIQUIDATED DAMAGES:$500.00 Each Bid must be accompanied by a certified or cashier's check made payable to the City of Santa Monica, or a Bidder's bond (using the form provided in the Bid Form) for an amount equal to at least ten percent (10%) of the amount bid as a guarantee that the Bidder will enter into a contract with the City. Bid bonds (or cashier's checks) must be scanned and uploaded into online. Within ten (10) Days after the issuance of the Notice of Award and prior to commencing Work on the Project, Contractor shall file with City good and sufficient Labor & Material Payment and Performance Bonds each in the amount of 100% of the Contract Sum. The bonds shall be signed by both Contractor and Surety and properly notarized on the City's provided forms or such other forms as required by City. Should any bond required hereunder or any surety on such bond become or be determined by City to be insufficient, it shall be replaced within ten (10) Days by a bond that fully complies with the requirements of Article 11.2 (Bond Requirements) of the City's General Conditions. No further payments to Contractor for Work performed shall be made or due until Contractor has fully complied with all the requirements. Bids may be rejected if they show any alteration in form, additions not called for, conditions or alternative Bids, incomplete Bids or irregularities. The City reserves the right to reject any and all Bids.

Post-Bid

Fitness / Rec Centers

$500,000.00

Public - City

Renovation

10

19

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
96
Bidding Soon
2,148
All Active Projects
948
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

img_map_placeholder

415 Pacific Coast Hwy, Santa Monica, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.