BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Site work and paving for a sidewalk / parking lot in Buellton, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of April 25, 2025, the project was awarded to V. Lopez Jr. & Sons, with an awarded amount of $$2,469,695.10.** The project is separated into two phases described as Phase 1 and Phase 2. Work for Phase 1 and Phase 2 are not sequential in project duration. Due to the need for environmental clearance and permits, there is expected to be approximately a one-year gap between phases. Bidders shall bid each phase independent of one other and assume there will be no overlap in work. The bid must be accompanied by a bid guarantee in the form of a certified or cashier's check or bidder's bond, made payable to the CITY OF BUELLTON for an amount no less than ten percent (10%) of the total bid amount. The CITY will deduct a five percent (5%) retention from all progress payments as specified in C9–MEASUREMENT & PAYMENT. For questions regarding this project, contact the Public Works Director, Rose Hess at E-Mail roseh@cityofbuellton.com. The CITY reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of forty-five (45) days.

Award

Sidewalks / Parking Lot

$2,469,695.00

Public - City

Paving, Site Work

17

8

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
42
Bidding Soon
554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

May 12, 2025

Project location map

202 Dairyland Rd, Buellton, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.