BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Savannah, Tennessee. Completed plans call for site work for a road / highway; and water / sewer project.

This Invitation for Bids is for the construction of BOLLINGER PHASE 3 AND PHASE 4, located in Caldwell County. The work generally consists of Streets, Drainage, Water and Wastewater Improvements. The Pre-Qualification Statement included in the proposal packet, and as required by Bollinger M.U.D., shall be completed in its entirety and submitted as part of the proposal. Any proposal lacking the Pre-Qualification Statement will not be considered. All questions, clarifications, requests must be received in writing via email to Lee Whited, P.E. lee@cbdeng.com and Chuck Corbett ccorbett@cbdeng.com and received no later than 1:00 p.m., Monday, October 28, 2024. Any requests received after that time and date will not be addressed. A Cashier's Check, Certified Check, or Bid Bond payable to Ranch Road Bollinger, LLC in an amount not less than 5% of the total bid must accompany each Bid as a guarantee that, if awarded the contract, the bidder will within 10 days of the award of the contract, enter into a contract and furnish an acceptable Performance and Payment Bond in the amount of 100% of the Contract price. The Bidder's surety will be forfeited and become the property of the Owner should the bidder fail to enter into a contract and furnish bonds acceptable to the Owner within 10 days after awarding the contract. Proposals shall not be withdrawn for a period of 90 days after the opening of the bids. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Owner's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. A Maintenance Bond will be required in the amount of 10% of the contract price and is to remain in force for a period of two years from the date of the letter of final acceptance from Caldwell County and the Bollinger M.U.D. Prevailing Wage Rates, in accordance with Government Code 2258, are applicable to this project.

Post-Bid

Water / Sewer

$1,460,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
22
Bidding Soon
369
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 30, 2024

img_map_placeholder

Multiple Locations, Savannah, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.