BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The general work requested is: Construction of, 8" concrete pavement, 8" high early strenght concrete Pavement, variable thickness concrete base, variable thickness asphaltic Concrete pavement, concrete curb and gutter, 5" concrete walks, detectable Warning field, pavement grinding, sealing pavement joints and cracks, gravel Filling, pavement markings, signage installation, concrete removals, sewer Work, water work, cuc ajustment, electrical conduit installation, tree Clearing & grubbing, topsoiling and sodding, etc. Located at: ST211230124 - North Prospect Avenue - East Knapp Street to East Ivanhoe Place ST211230140 - North Water Street - East Brady Street to North Humboldt Avenue Time for Completion: This contract has a full completion of June 6, 2025. The work under this contract shall commence within a week after the full execution of the contract, starting at the southern crosswalk on North Prospect Avenue and proceeding north, or as directed by the Project Engineer Liquidated Damages, per diem: $1000.00/Day The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukee's B2GNow contract compliance software within 30 days of the contract award date

Bid Results

Roads / Highways

$311,068.00

Public - City

Paving, Site Work

5

3

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
63
Bidding Soon
1,064
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

img_map_placeholder

Multiple Locations, Milwaukee, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.