Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Site work and paving for a road / highway in Jonesburg, Missouri. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

https://www.kbia.org/kbia-news/2025-12-04/modot-selects-contractors-for-rocheport-to-columbia-i-70-project The Rocheport bridge has expanded from holding four lanes to six and serves as an important connection across I-70. The Missouri Highways and Transportation Commission has selected Columbia-based Emery Sapp & Sons (ESS), partnered with St. Louis contractor Parsons Transportation group, as the contractors who will lead the reconstruction project of Interstate 70 between Rocheport and Columbia. ESS Executive Vice President of Operations Josh Doerhoff says his team made Columbia a cornerstone of the winning bid. “MoDOT had a vision to transform Columbia,” Doerhoff said. “Transforming Columbia remained a motto for our team through the entire pursuit.” Construction for the $441 million Rocheport to Columbia project is anticipated to begin in the middle of 2026 and is set to be completed by December 2029. In order to not significantly disrupt traffic flow, the team has committed to keeping two lanes of travel open in each direction during peak travel times. The Improve I-70 program is expanding the road to three lanes each way between St. Louis and Kansas City. The $2.8 billion undertaking has been divided into eight segments of the road, each with corresponding projects awarded to contractors. The announcement marks the fourth project of the Improve I-70 program to now officially be underway, with four still in the design or procurement phase. Although there are still about 193 miles along I-70 awaiting a third lane, MoDOT officials say the entire project is on track – and on budget – to finish by its December 2030 deadline. Improve I-70 Program Director Eric Kopinski says even though only seven miles of new road has currently been laid, people will begin to see faster progress once all the contractors are secured. “This is some of the most significant work we’ve ever done in the history of Missouri and the history of MoDOT,” Kopinski said. “So it's gonna take a little time and little patience as we make these improvements.” ______________________________________________ Safety and capacity improvements from Kingdom City to Warrenton (two disconnected sections). Project involves bridge A0096. Length : 40.97 Route : IS 70 County : Montgomery Award Date: 2026 As of February 11, 2026 , the project is in Conceptual status Anticipated letting date is 2028 MODOT - Safety and Capacity Improvements - I-70 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as become available.

Conceptual

Roads / Highways

$508,583,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
181
Bidding Soon
1,460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.