BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and renovation of a mixed-use development in Miami, Florida. Working plans call for the renovation of a fire / police facility; for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.

The project consists of developing a site and placing into operation a new temporary fire station facility, provided by Extreme Modular Building, located at 15430 SW 184 Street, Miami, FL, within a portion of a 10-acre site. Construction of the facility will comprise of, but not limited to the following: Site Clearing; Earthwork; Geo-technical Testing; Civil; Structural Concrete; Drainage, Paving & Striping; Fencing; Gate Operations and Equipment; Temporary Electrical Services, FPL secondary Electrical Service; Electrical Low Voltage (CATV & Data); MDFR Security Card Access System, Coordination & Programming; Plumbing connections; Structural Foundation, Pedestal and Welding; Stucco; Painting; Flashing & Sealants; Flag Pole; Railing; Fire Protection and Connection; Fire Alarm System & Coordination; Site Lighting; Landscaping; Subterranean & Termite Control; AT&T Coordination; MD-WASD Connection (Utility Installation & Coordination); Signage; for a complete installation for the operation of a Fire Rescue Facility. SBE-Service: 2.00% Contractors will be required to work with MDFR vendors during the installation of the Extreme Modular Building, Not-In-Contract (NIC).

Final Planning

Roads / Highways

$1,850,000.00

Public - County

Outdoor Lighting, Paving, Renovation, Site Work

30

4

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
34
Bidding Soon
992
All Active Projects
441
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

January 6, 2025

img_map_placeholder

15430 SW 184th St, Miami, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.