BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Stockton, California. Completed plans call for site work for a fire / police facility; transportation facility; and for paving for a transportation facility.

The County of San Joaquin (County) intends to award to the most qualified Design-Build Entity, a Progressive Design-Build (PDB) Contract for the Stockton Metropolitan Airport Improvements project. The County will review and score the Statement of Qualification (SOQs) to determine which Design-Build Entities are best suited and qualified to successfully execute the design and construction of the Project. A list of at least three (3) of the highest-ranked RFQ Design-Build Entities will be created, each of which will be invited to submit proposals in response to the County's forthcoming Request for Proposals (RFP). Pre-Qualification Meeting A pre-qualification meeting scheduled at 2:00 p.m. on October 30, 2024, will be held at: County of San Joaquin Department of Aviation 5000 S. Airport Way, STE 202 Stockton, CA 95206 Question Deadline 11/01/2024 at 2:00 PM PT potential Design-Build Entities shall direct questions related to this RFQ to: Ephraim Cadainq, Interim Deputy Director Purchasing and Support Services Department at email address ecadaing@sjgov.org. General aviation facilities to be constructed include: o 36 newT-hangar units (2 sizes) to replace existing o Five new corporate hangars (3,600 sq ft each) o Six aircraft sunshade tie down spaces o One self-serve fuel farm featuring four grades of fuel; one fuel farm (storage) o Associated apron pavement improvements General purpose facilities to be constructed include: o One 1,600 sq ft fire station awning structure (3 sides, no door) o One 8,000 sq ft cold storage building (airport equipment and materials) Airline terminal building facilities to include: o Remodel the entire ticketing, bag claim, restroom, and TSA que areas of the existing terminal. Reuse the existing hold room. o Construct a new 30,000 sq ft hold room at grade with toilet rooms and rough concessions (five gates, peak hour capacity of 400 passengers). o Planning for a Customs and Border Protection facility to accommodate 200 passengers (A change order is contemplated during project delivery regarding the design and construction of the customs facility)

GC Bidding

Transportation Terminals

$24,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
84
Bidding Soon
1,976
All Active Projects
796
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2024

March 24, 2025

img_map_placeholder

5000 S Airport Way, Stockton, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.