Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Toutle, Washington. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.
RFQ Design -Gilmore Road Studebaker Creek Fish Passage Protect. Any Questions Regarding This Project Should Be Directed to Ron Boursaw, at 360-577-3030 Ext 6530 or by E-mail - Boursawr@cowlitzwa.gov. This Material Can Be Made Available in an Alternate Format by Emailing Cowlitz County Department of Public Works at Publicworks@co.cowlitz.wa.us or by Calling 360-577-3030. Americans With Disabilities Act (Ada) Information: Cowlitz County in Accordance With Section 504 of the Rehabilitation Act and the Americans With Disabilities Act (Ada), Commits to Nondiscrimination on the Basis of Disability, in All of Its Programs and Activities. Project Description: the Work to Be Performed by the Consultant Consists of Preparing Civil, Structural, Geotechnical and Environmental Engineering Design and Permitting for Replacement of the Culvert on Gilmore Road at Milepost 0.14. The Work Also Includes Providing Engineering Support During Construction. The Proposed Project Includes Replacing the Existing Concrete Box Culvert With a New Structure That Meets the Washington Department of Fish & Wildlife Requirements for Fish Passage. The New Structure Shall Be Long Enough to Support a 24-foot-wide Paved Road to Meet County Standards for a Rural Local Access. Included in the Project Will Be Streambed Restoration and Riparian Plantings in the Vicinity of the Culverts and Reconstruction of the Roadway Approaches. The County Will Provide the Topographic Survey, Boilerplate Specifications, and Pavement Section. The County Will Be Responsible for Developing Right of Way Plans, Obtaining Appraisals and Negotiating for Easement Acquisition and for Project Bidding and Award. The Major Features of the Project Are as Follows: Remove the Existing Culvert; Wetland and Ordinary High-water Delineation; Geotechnical Engineering to Determine Subsurface Conditions and to Develop Foundation Recommendations; Environmental Documentation and Preparation of Permit Applications for All Federal, State and Local Permits (Nepa/sepa/critical Areas/shorelines); Hydraulic Design of the Water Crossing Structure Openings; Determining 100-year Flood Water Surface Elevations; Structural Design of the New Water Crossing Structures; Temporary Traffic Control Including Any Necessary Temporary Traffic Bypass Roads. Special Provisions: Wetland Mitigation Bank Use Plan; Construction Support Including Submittal Review, Responses to Requests for Information, and Site Inspections of Key Construction Items. Construction is Planned for 2026 With an Advertisement Date of February 2026. The County is a Member of the Regional Rural Road Maintenance Program of the Endangered Species Act 4(D). There is a Wetland Mitigation Bank Currently Available for Mitigation Credits for Any Project Wetland or Riparian Area Impacts. Evaluation Criteria: Submittals Will Be Evaluated and Ranked Based on the Following Criteria: 1) Qualification of Proposed Key Personnel (15 Points); 2) Qualifications/expertise/experience of Firm and Subconsultants (20 Points); 3) Ability to Meet Schedule (15 Points); 4)approach to Project (20 Points); 5) Familiarity With Wsdot/fhwa Standards/requirements (15 Points); 6) Past Performance/references (15 Points) This Project is Federally Funded, and Consultants Will Be Held to Federal Equal Employment Opportunity Requirements. The Consultant Shall Refer to Chapter 27 of the Wsdot Local Agency Guidelines. Submittal: Submittals Should Include the Following Information for the Prime Consultant and Subconsultants: Firm Name, Phone and Fax Numbers; Name of Principal-in-charge and Project Manager; and Number of Employees in Each Firm Proposed for the Project. This Agreement Will Be for Approximately 24 Months in Duration With the Option for the County to Extend It for Additional Time and Money if Necessary. The County Plans to Enter Into a Professional Services Negotiated Hourly Rate Consultant Agreement With the Selected Firm. The County May Choose to Supplement the Agreement for Future Phases (Right of Way, Construction). This Project Has Federal Funds From the Federal Highway Administrations (Fhwa) Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (Protect) Formula Program Funding. This Project Has a Mandatory Disadvantaged Business Enterprises (Dbe) Goal of 16%. Additionally, Payment Reporting in the Diversity Management and Compliance System (Dmcs) Will Be a Requirement of This Consultant Agreement. The Funding is Administered by the Washington State Department of Transportation (Wsdot). Cowlitz County Will Be Following the Requirements of the Wsdot Local Agency Guidelines Manual Including Chapter 31 Consultant Requirements and Agreement Forms. Title Vi Statement: Cowlitz County in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252,42 U.s.c. 2000d to 2000d-4) and the Regulations, Hereby Notifies All Bidders That Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. The County Reserves the Right to Amend Terms of This Request for Qualifications (Rfq) to Circulate Various Addenda, or to Withdraw the Rfq at Any Time, Regardless of How Much Time and Effort Consultants Have Spent on Their Responses. The method of Contractor Selection has not been Determined at this time.
Conceptual
Bridges / Tunnels
$300,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 31, 2025
Gilmore Rd, Toutle, WA
Related To This Project
Toutle, WA
Bid Date: Oct 05 2022
Renton, WA
Bid Date: Nov 06 2024
Issaquah, WA
Bid Date: Nov 01 2024
Kent, WA
Bid Date: Nov 14 2024
Port Orchard, WA
Bid Date: Oct 22 2024
Anacortes, WA
Bid Date: Oct 30 2024
Spokane, WA
--
Brewster, WA
Bid Date: Nov 13 2024
Shoreline, WA
Bid Date: Dec 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.