BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 12, 2024 at 8:00 PM

Updated November 7, 2024

Renovation of an educational facility in Renton, Washington. Completed plans call for the renovation of a educational facility.

Mezzanine Freeze Protection Phase 2 Project. Project Bryn Mawr Es, 8212 S 118th St, Seattle, Wa 98178 Campbell Hill Es, 6418 S 124th St, Seattle, Wa 98178 Highlands Es, 2720 Ne 7th St, Renton, Wa 98056 Lakeridge Es, 7400 S 115th St, Seattle, Wa 98178 Tiffany Park Es,1601 Lake Youngs Way Se, Renton, Wa 98058. Architect/engineer's Cost Opinion: $363,400.00 More and Must Be Accompanied by a Certified Check, Bank Cashier's Check, or Bid Bond, Equal to 5% of the Total Base Bid Only, Excluding Taxes. Make Checks Payable to the Renton School District; Furnish Bond Executed by a Licensed Bonding Agency Authorized to Do Business in the Locality of the Project. Prevailing Wage: It is the Responsibility of the Bidder to Go Online Description of Work: the Work Includes, but is Not Limited to: 1. Provide 2 New Electric Unit Heaters at Bryn Mawr Elementary School in Mechanical Spaces for Freeze Protection, Including Associated Power Wiring and Controls. 2. Provide 5 New Electric Unit Heaters at Campbell Hill Elementary School in Mechanical Spaces for Freeze Protection, Including Associated Power Wiring and Controls. 3. Provide 7 New Electric Unit Heaters at Highlands Elementary School in Mechanical Spaces for Freeze Protection, Including Associated Power Wiring and Controls. 4. Provide 6 New Electric Unit Heaters at Lakeridge Elementary School in Mechanical Spaces for Freeze Protection, Including Associated Power Wiring and Controls. 5. Reroute One 1-1/2" Fire Sprinkler Branch Pipe Out of Exterior Soffit Area to Within Building Envelope at Lakeridge Elementary School. 6. Provide 7 New Electric Unit Heaters at Tiffany Park Elementary School in Mechanical Spaces for Freeze Protection, Including Associated Power Wiring and Controls. This Project is Estimated to Cost $250,000.00 Apprenticeship Requirement: This Project is Not Estimated to Cost One Million Dollars or More. Withdraw of Bid: No Bid May Be Withdrawn, Except With the Express Permission of the Owner, After the Time Set for the Opening Thereof, Unless the Award of Contract is Delayed for a Period Exceeding 45 Days. document notes. Documents May Be Shipped With Shipping Purchased Directly From Arc. To Be Added to the Plan Holder's List, Send an Email to Seattle.bid.services@e-arc.com. Bid Documents May Be Viewed at the Following Locations. Bid Documents Return: Deposits Will Be Returned to Bidders Upon Return of the Bid Documents to Arc in Good Condition Within 10 Days Following Bid Opening. Right to Reject: the Owner Reserves the Right to Accept the Lowest or Any Other Bid, the Right to Reject Any or All Bids, and the Right to Waive Any Irregularities in Any Bid.

Post-Bid

Educational

$250,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
106
Bidding Soon
1,773
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

December 6, 2024

Project location map

Multiple Locations, Renton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.