BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 8, 2021 at 8:00 PM

Updated October 15, 2024

Site work and paving for a road / highway in Renton, Washington. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of June 8, 2021, this project is still in the design phase. Information regarding a general contractor or a timeline of construction has not been determined. Closed solicitation has been included below for reference which will begin in 2023. ............. The purpose of this contract is to provide multidisciplinary engineering, planning, and design services to King County Metro Transit (Metro) for the upcoming RapidRide 1033 which will serve Renton, Kent and Auburn. The Consultant plan, develop, design, and produce bidding documents for roadway/signal/sidewalk improvements, transit passenger facilities, and Metro communication infrastructure, as well as any other needed components (e.g. topographic survey) for the RapidRide 1033. Components of tasks associated with gaining support, concurrence, agreement, or approval for any of the civil infrastructure improvements shall be the responsibility of the Consultant. These tasks may include: public outreach, environmental review/documentation, permitting assistance, private license agreements, right-of-way negotiations and inter-jurisdictional negotiations. Specific tasks will be led by individual County task leads and the level of Consultant involvement may vary. The contract is anticipated to be phased as follows and as detailed below in the Scope of Work: Phase 1: Planning, Alternatives Analysis, Environmental Documentation and 10% Predesign Phase 2: Final Design, Right-of-Way (ROW), Permitting and Bidding Services Phase 3: Services During Construction This Scope of Work reflects the County's current understanding of the work, however it may be updated during negotiations. Phase 1 Estimated Price: $2,750,000.00; Phase 1 Estimated Period of Performance: 14 months Total Estimated Price(all phases): $13,750,000.00 ;Total Estimated Period of Performance: 48 months The method of contractor selection has not been determined at this time

Design

Roads / Highways

$13,750,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
107
Bidding Soon
1,775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2023

July 3, 2023

Project location map

Multiple Locations, Renton, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.