BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in San Diego, California. Completed plans call for the renovation of a educational facility.

Scope of work consists of core and shell alterations to all three levels of buildings A and B with the exception of the north side of building B, level 1. The total floor area is 43,711 gross square feet. The core and shell alterations consist of a seismic upgrade for existing building A, which is of type V-B non-rated construction and tenant improvements of buildings A and B. The buildings will be reclassified as mixed-use occupancy (Group E on levels 1 and 2. And Group B on levels 3). The work includes a seismic upgrade due to the change in occupancy, core and shell improvements on all levels. Other improvements are noted below: Improvements to the site and building to comply with the accessibility requirements of 2019 California building code, chapter 11b. Selective demolition to accommodate functional requirements of the charter school, including but not limited to demolition of existing non-load bearing walls, demolition of existing ceiling systems, lighting and electrical systems, HVAC systems, interior finishes, exterior wall cladding, and exterior window systems. Seismic upgrade improvements to building A include replacement of some existing foundation systems, strengthening of existing beams and framing, and replacement of existing brace frames. Tenant improvements include new non-load bearing walls, new ceiling systems, new lighting systems, new electrical systems, new HVAC systems, and new interior finishes. Estimated Bid Value $25,200,000.00 Online Q&A No Project Type Bid Response Types Line Items Type of Award Lump Sum Prequalifications are due to the District by October 24, 2024. Effective March 1, 2024, any solicitation opening after March 1, 2024, will no longer require Non-MEP prequalification. MEP (Mechanical/Electrical/Plumbing): Subcontractors performing work under one or more of the following license classifications: A or B, and/or performing work of C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 should submit their prequalification application on at online. o Prequalifications for Soltek Pacific Construction are due prior to October 24, 2024, at 2:00 p.m. . It is required that bidders possess any of the following classification(s) of California State Contractors License(s) (or other appropriate license, subject to District approval), valid and in good standing, at the time of bid opening and contract award. This project is being bid as "Bid Packages" per contract number. The bidder must self-perform a minimum of 15% of each bid package that is being bid. If a bidder is interested in bidding multiple bid packages, the bidder must submit individual bids for each bid package per GMP. Bidders may demonstrate economy of scale savings on their proposal forms by bidding multiple bid packages for a single GMP. However, bidders may NOT combine multiple bid packages for multiple GMPs, into a single GMP submission. All bids will be reviewed and evaluated for completeness of scope coverage. Subcontracts shall be awarded, if awarded at all, by the general contractor on the basis of lowest bid. The District defines lowest bid as the lowest responsive, responsible bid for a single bid package or the summation of the lowest value of multiple bid packages, if multiple bid packages were proposed by a subcontractor. If DVBE mandatory participation is needed, the next lowest subcontractor who can meet the minimum 3% DVBE requirement may be selected. Prevailing wage requirements apply to all public works projects and must be followed per Article 17 of the General Conditions of the Request for Proposals. The applicable prevailing wage determination during construction is the one in effect on the date the GMP is first published in a newspaper of general circulation. Here, the applicable prevailing wage determination for construction services referenced in the published GMP advertisement is 2024-2. The first bid advertisement date for each District defined GMP phase shall establish the applicable prevailing wage determination, regardless of how many times the Prime Contractor published an advertisement. That first bid advertisement to subcontractors shall state the applicable prevailing wage determination for construction services for the duration of that District defined GMP phase. Each District defined GMP phase for construction services may have a different prevailing wage determination based on its separate publication of the first bid advertisement date. The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding process. No bidder may withdraw his bid for a period of 90 days after the date set for the opening of bids. For access to the documents, please contact Kim Kanie at kkanie@soltekpacific.com including: Company name, address, phone number, CA License # & classification(s), main point of contact, and bid package number(s) interested in bidding. As of October 21, 2024, construction is expected to start February 2025. Completion is expected by December 2026.

Post-Bid

Educational

$25,200,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
30
Bidding Soon
854
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

February 3, 2025

img_map_placeholder

3420 Camino Del Rio N, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.